**Why isn't my task getting scheduled?**
|
|
|
|
There are very many reasons why your task might not be getting scheduled.
|
|
Here are some of the common causes:
|
|
|
|
- Does your script "compile", can the Airflow engine parse it and find your
|
|
DAG object. To test this, you can run ``airflow list_dags`` and
|
|
confirm that your DAG shows up in the list. You can also run
|
|
``airflow list_tasks foo_dag_id --tree`` and confirm that your task
|
|
shows up in the list as expected. If you use the CeleryExecutor, you
|
|
may way to confirm that this works both where the scheduler runs as well
|
|
as where the worker runs.
|
|
|
|
- Is your ``start_date`` set properly? The Airflow scheduler triggers the
|
|
task soon after the ``start_date + scheduler_interval`` is passed.
|
|
|
|
- Is your ``start_date`` beyond where you can see it in the UI? If you
|
|
set your it to some time say 3 months ago, you won't be able to see
|
|
it in the main view in the UI, but you should be able to see it in the
|
|
``Menu -> Browse ->Task Instances``.
|
|
|
|
- Are the dependencies for the task met. The task instances directly
|
|
upstream from the task need to be in a ``success`` state. Also,
|
|
if you have set ``depends_on_past=True``, the previous task instance
|
|
needs to have succeeded (except if it is the first run for that task).
|
|
Also, if ``wait_for_downstream=True``, make sure you understand
|
|
what it means.
|
|
You can view how these properties are set from the ``Task Details``
|
|
page for your task.
|
|
|
|
- Are the DagRuns you need created and active? A DagRun represents a specific
|
|
execution of an entire DAG and has a state (running, success, failed, ...).
|
|
The scheduler creates new DagRun as it moves forward, but never goes back
|
|
in time to create new ones. The scheduler only evaluates ``running`` DagRuns
|
|
to see what task instances it can trigger. Note that clearing tasks
|
|
instances (from the UI or CLI) does set the state of a DagRun back to
|
|
running. You can bulk view the list of DagRuns and alter states by clicking
|
|
on the schedule tag for a DAG.
|
|
|
|
- Is the ``concurrency`` parameter of your DAG reached? ``concurency`` defines
|
|
how many ``running`` task instances a DAG is allowed to have, beyond which
|
|
point things get queued.
|
|
|
|
- Is the ``max_active_runs`` parameter of your DAG reached? ``max_active_runs`` defines
|
|
how many ``running`` concurrent instances of a DAG there are allowed to be.
|
|
|
|
You may also want to read the Scheduler section of the docs and make
|
|
sure you fully understand how it proceeds.
|
|
|
|
|
|
**How do I trigger tasks based on another task's failure?**
|
|
|
|
Check out the ``Trigger Rule`` section in the Concepts section of the
|
|
documentation
|
|
|
|
**Why are connection passwords still not encrypted in the metadata db after I installed airflow[crypto]**?
|
|
|
|
- Verify that the ``fernet_key`` defined in ``$AIRFLOW_HOME/airflow.cfg`` is a valid Fernet key. It must be a base64-encoded 32-byte key. You need to restart the webserver after you update the key
|
|
- For existing connections (the ones that you had defined before installing ``airflow[crypto]`` and creating a Fernet key), you need to open each connection in the connection admin UI, re-type the password, and save it
|
|
|
|
**What's the deal with ``start_date``?**
|
|
|
|
``start_date`` is partly legacy from the pre-DagRun era, but it is still
|
|
relevant in many ways. When creating a new DAG, you probably want to set
|
|
a global ``start_date`` for your tasks using ``default_args``. The first
|
|
DagRun to be created will be based on the ``min(start_date)`` for all your
|
|
task. From that point on, the scheduler creates new DagRuns based on
|
|
your ``schedule_interval`` and the corresponding task instances run as your
|
|
dependencies are met. When introducing new tasks to your DAG, you need to
|
|
pay special attention to ``start_date``, and may want to reactivate
|
|
inactive DagRuns to get the new task to get onboarded properly.
|
|
|
|
We recommend against using dynamic values as ``start_date``, especially
|
|
``datetime.now()`` as it can be quite confusing. The task is triggered
|
|
once the period closes, and in theory an ``@hourly`` DAG would never get to
|
|
an hour after now as ``now()`` moves along.
|
|
|
|
We also recommend using rounded ``start_date`` in relation to your
|
|
``schedule_interval``. This means an ``@hourly`` would be at ``00:00``
|
|
minutes:seconds, a ``@daily`` job at midnight, a ``@monthly`` job on the
|
|
first of the month. You can use any sensor or a ``TimeDeltaSensor`` to delay
|
|
the execution of tasks within that period. While ``schedule_interval``
|
|
does allow specifying a ``datetime.timedelta``
|
|
object, we recommend using the macros or cron expressions instead, as
|
|
it enforces this idea of rounded schedules.
|
|
|
|
When using ``depends_on_past=True`` it's important to pay special attention
|
|
to ``start_date`` as the past dependency is not enforced only on the specific
|
|
schedule of the ``start_date`` specified for the task. It' also
|
|
important to watch DagRun activity status in time when introducing
|
|
new ``depends_on_past=True``, unless you are planning on running a backfill
|
|
for the new task(s).
|
|
|
|
Also important to note is that the tasks ``start_date``, in the context of a
|
|
backfill CLI command, get overridden by the backfill's command ``start_date``.
|
|
This allows for a backfill on tasks that have ``depends_on_past=True`` to
|
|
actually start, if it wasn't the case, the backfill just wouldn't start.
|