* [jenkins] Add support for enabling device builds using labels.
* [xharness] Give the iOS MSBuild tests 30 minutes to finish.
* [mtouch tests] Give the BuildTestProject 10 minutes to compile each test case.
Wrench bots build the dontlink test in ~3m40, but that's apparently not enough
for the Jenkins bots (slower bots?), which time out the test after 5 minutes.
So double the timeout to 10 minutes, which will hopefully give the Jenkins
bots enough time to run the test to completion.
* [Jenkins] Make test to write output as an xml file so that it can be parsed by the jenkins bot.
* Point to the correct Touvh.Unit repo.
* Use the available property to determine if we are being ran in Jenkins.
* Log where are test results stored.
* Add @MonkeyWrench: prefix.
* Ensure that we do set the build env in jenkins/run-tests.sh
* Do not mix Wrench with Jenkins. The reports in jenkins can be Xml, in Wrench we prefer the old style.
* Ensure that the main node of the unit tests does contain the target, that will improve the tests results reporting.
* Revert "Fix binding project LinkWithAttributes generation to prevent rebuilds" (#1018)
* Added xslt to be used to keep the old Test Reports until we move to only Jenkins reports.
* Add an extra log for the xslt transformation.
* Point to the correcto dir in jenkins.
* Deal with the xslt once we have finished rather than in a batch.
* Remove noise.
* Readd case removed in rebase.
* Fix indentation.
* Skip lock keychain.