curl release procedure - how to do a release
============================================
in the source code repo
-----------------------
- run `./scripts/copyright.pl` and correct possible omissions
- edit `RELEASE-NOTES` to be accurate
- update `docs/THANKS`
- make sure all relevant changes are committed on the master branch
- tag the git repo in this style: `git tag -a curl-7_34_0`. -a annotates the
tag and we use underscores instead of dots in the version number. Make sure
the tag is GPG signed (using -s).
- run `./maketgz 7.34.0` to build the release tarballs. It is important that
you run this on a machine with the correct set of autotools etc installed
as this is what then will be shipped and used by most users on \*nix like
systems.
- push the git commits and the new tag
- GPG sign the 4 tarballs as `maketgz` suggests
- upload the 8 resulting files to the primary download directory
in the curl-www repo
--------------------
- edit `Makefile` (version number and date),
- edit `_newslog.html` (announce the new release) and
- edit `_changes.html` (insert changes+bugfixes from RELEASE-NOTES)
- commit all local changes
- tag the repo with the same name as used for the source repo.
- make sure all relevant changes are committed and pushed on the master branch
(the website then updates its contents automatically)
on GitHub
---------
- edit the newly made release tag so that it is listed as the latest release
inform
------
- send an email to curl-users, curl-announce and curl-library. Insert the
RELEASE-NOTES into the mail.
celebrate
---------
- suitable beverage intake is encouraged for the festivities
curl release scheduling
=======================
Release Cycle
-------------
We do releases every 8 weeks on Wednesdays. If critical problems arise, we can
insert releases outside of the schedule or we can move the release date - but
this is rare.
Each 8 week release cycle is split in two 4-week periods.
- During the first 4 weeks after a release, we allow new features and changes
to curl and libcurl. If we accept any such changes, we bump the minor number
used for the next release.
- During the second 4-week period we do not merge any features or changes, we
then only focus on fixing bugs and polishing things to make a solid coming
release.
- After a regular procedure-following release (made on Wednesdays), the
feature window remains closed until the following Monday in case of special
actions or patch releases etc.
If a future release date happens to end up on a "bad date", like in the middle
of common public holidays or when the lead release manager is away traveling,
the release date can be moved forwards or backwards a full week. This is then
advertised well in advance.
Critical problems
-----------------
We can break the release cycle and do a patch release at any point if a
critical enough problem is reported. There is no exact definition of how to
assess such criticality, but if an issue is highly disturbing or has a
security impact on a large enough share of the user population it might
qualify.
If you think an issue qualifies, bring it to the curl-library mailing list and
push for it.
Coming dates
------------
Based on the description above, here are some planned release dates (at the
time of this writing):
- October 26, 2022 (7.86.0)
- December 21, 2022
- February 15, 2023 (last version 7 release, no feature window after)
- March 20, 2023 (8.0.0 - curl 25 years)
- April 17, 2023
- July 12, 2023
- September 6, 2023
- November 1, 2023
- December 27, 2023