post | Events in Blazor Gantt Chart Component | Syncfusion | Checkout and learn here all about Events in Syncfusion Blazor Gantt Chart component and much more details. | Blazor | Gantt Chart | ug |
Events in Blazor GanttChart Component
In this section, the list of events of the Gantt Chart component has been provided which will be triggered for appropriate Gantt Chart actions.
The events should be provided to the Gantt Chart using the GanttChartEvents component. When using events of the Gantt Chart, TValue must be provided in the GanttChartEvents component.
OnActionBegin
OnActionBegin event triggers when Gantt Chart actions such as sorting, filtering, editing etc., starts.
@using Syncfusion.Blazor.Gantt
<SfGantt DataSource="@TaskCollection" Height="450px" Width="700px">
<GanttTaskFields Id="TaskId" Name="TaskName" StartDate="StartDate" EndDate="EndDate" Duration="Duration" Progress="Progress" Child="SubTasks">
</GanttTaskFields>
<GanttEditSettings AllowEditing="true" Mode="Syncfusion.Blazor.Gantt.EditMode.Auto" AllowTaskbarEditing="true"></GanttEditSettings>
<GanttEvents TValue="TaskData" OnActionBegin="actionBegin"></GanttEvents>
</SfGantt>
@code{
public List<TaskData> TaskCollection { get; set; }
protected override void OnInitialized()
{
this.TaskCollection = GetTaskCollection();
}
public void actionBegin(GanttActionEventArgs<TaskData> args)
{
//Here you can customize your code
}
public class TaskData
{
public int TaskId { get; set; }
public string TaskName { get; set; }
public DateTime StartDate { get; set; }
public DateTime EndDate { get; set; }
public string Duration { get; set; }
public int Progress { get; set; }
public List<TaskData> SubTasks { get; set; }
}
public static List<TaskData> GetTaskCollection()
{
List<TaskData> Tasks = new List<TaskData>() {
new TaskData() {
TaskId = 1,
TaskName = "Project initiation",
StartDate = new DateTime(2019, 04, 02),
EndDate = new DateTime(2019, 04, 21),
SubTasks = (new List <TaskData> () {
new TaskData() {
TaskId = 2,
TaskName = "Identify Site location",
StartDate = new DateTime(2019, 04, 02),
Duration = "0",
Progress = 30,
},
new TaskData() {
TaskId = 3,
TaskName = "Perform soil test",
StartDate = new DateTime(2019, 04, 02),
Duration = "4",
Progress = 40,
},
new TaskData() {
TaskId = 4,
TaskName = "Soil test approval",
StartDate = new DateTime(2019, 04, 02),
Duration = "0",
Progress = 30
},
})
},
new TaskData() {
TaskId = 5,
TaskName = "Project estimation",
StartDate = new DateTime(2019, 04, 02),
EndDate = new DateTime(2019, 04, 21),
SubTasks = (new List <TaskData> () {
new TaskData() {
TaskId = 6,
TaskName = "Develop floor plan for estimation",
StartDate = new DateTime(2019, 04, 04),
Duration = "3",
Progress = 30,
},
new TaskData() {
TaskId = 7,
TaskName = "List materials",
StartDate = new DateTime(2019, 04, 04),
Duration = "3",
Progress = 40
},
new TaskData() {
TaskId = 8,
TaskName = "Estimation approval",
StartDate = new DateTime(2019, 04, 04),
Duration = "0",
Progress = 30,
}
})
}
};
return Tasks;
}
}
OnActionComplete
OnActionComplete event triggers when Gantt Chart actions such as sorting, filtering, editing etc. are completed.
@using Syncfusion.Blazor.Gantt
<SfGantt DataSource="@TaskCollection" Height="450px" Width="700px">
<GanttTaskFields Id="TaskId" Name="TaskName" StartDate="StartDate" EndDate="EndDate" Duration="Duration" Progress="Progress" Child="SubTasks">
</GanttTaskFields>
<GanttEditSettings AllowEditing="true" Mode="Syncfusion.Blazor.Gantt.EditMode.Auto" AllowTaskbarEditing="true"></GanttEditSettings>
<GanttEvents TValue="TaskData" OnActionComplete="OnActionComplete"></GanttEvents>
</SfGantt>
@code{
public List<TaskData> TaskCollection { get; set; }
protected override void OnInitialized()
{
this.TaskCollection = GetTaskCollection();
}
public void OnActionComplete(GanttActionEventArgs<TaskData> args)
{
//Here you can customize your code
}
public class TaskData
{
public int TaskId { get; set; }
public string TaskName { get; set; }
public DateTime StartDate { get; set; }
public DateTime EndDate { get; set; }
public string Duration { get; set; }
public int Progress { get; set; }
public List<TaskData> SubTasks { get; set; }
}
public static List<TaskData> GetTaskCollection()
{
List<TaskData> Tasks = new List<TaskData>() {
new TaskData() {
TaskId = 1,
TaskName = "Project initiation",
StartDate = new DateTime(2019, 04, 02),
EndDate = new DateTime(2019, 04, 21),
SubTasks = (new List <TaskData> () {
new TaskData() {
TaskId = 2,
TaskName = "Identify Site location",
StartDate = new DateTime(2019, 04, 02),
Duration = "0",
Progress = 30,
},
new TaskData() {
TaskId = 3,
TaskName = "Perform soil test",
StartDate = new DateTime(2019, 04, 02),
Duration = "4",
Progress = 40,
},
new TaskData() {
TaskId = 4,
TaskName = "Soil test approval",
StartDate = new DateTime(2019, 04, 02),
Duration = "0",
Progress = 30
},
})
},
new TaskData() {
TaskId = 5,
TaskName = "Project estimation",
StartDate = new DateTime(2019, 04, 02),
EndDate = new DateTime(2019, 04, 21),
SubTasks = (new List <TaskData> () {
new TaskData() {
TaskId = 6,
TaskName = "Develop floor plan for estimation",
StartDate = new DateTime(2019, 04, 04),
Duration = "3",
Progress = 30,
},
new TaskData() {
TaskId = 7,
TaskName = "List materials",
StartDate = new DateTime(2019, 04, 04),
Duration = "3",
Progress = 40
},
new TaskData() {
TaskId = 8,
TaskName = "Estimation approval",
StartDate = new DateTime(2019, 04, 04),
Duration = "0",
Progress = 30,
}
})
}
};
return Tasks;
}
}
OnActionFailure
OnActionFailure event trigger when any Gantt Chart action failed to achieve the desired results. By using this event the error details and their cause is achieved. In the following sample, the wrong field name has been provided for the IdMapping property, so that it will throw the OnActionFailure event.
@using Syncfusion.Blazor.Gantt
@using Syncfusion.Blazor.Grids
<SfGantt DataSource="@TaskCollection" Height="450px" Width="900px">
<GanttTaskFields Id="TaskIdd" Name="TaskName" StartDate="StartDate" EndDate="EndDate"
Duration="Duration" Progress="Progress" Child="SubTasks">
</GanttTaskFields>
<GanttEditSettings AllowEditing="true" Mode="Syncfusion.Blazor.Gantt.EditMode.Auto"></GanttEditSettings>
<GanttEvents TValue="TaskData" OnActionFailure="ActionFailureHandler"></GanttEvents>
</SfGantt>
@code{
public SfGantt<TaskData> Gantt;
public void ActionFailureHandler(FailureEventArgs args)
{
// Here you can get the error details in the args
}
public List<TaskData> TaskCollection { get; set; }
protected override void OnInitialized()
{
this.TaskCollection = GetTaskCollection();
}
public class TaskData
{
public int TaskId { get; set; }
public string TaskName { get; set; }
public DateTime StartDate { get; set; }
public DateTime EndDate { get; set; }
public string Duration { get; set; }
public int Progress { get; set; }
public List<TaskData> SubTasks { get; set; }
}
public static List<TaskData> GetTaskCollection()
{
List<TaskData> Tasks = new List<TaskData>() {
new TaskData() {
TaskId = 1,
TaskName = "Project initiation",
StartDate = new DateTime(2019, 04, 02),
EndDate = new DateTime(2019, 04, 21),
SubTasks = (new List <TaskData> () {
new TaskData() {
TaskId = 2,
TaskName = "Identify Site location",
StartDate = new DateTime(2019, 04, 02),
Duration = "0",
Progress = 30,
},
new TaskData() {
TaskId = 3,
TaskName = "Perform soil test",
StartDate = new DateTime(2019, 04, 02),
Duration = "4",
Progress = 40,
},
new TaskData() {
TaskId = 4,
TaskName = "Soil test approval",
StartDate = new DateTime(2019, 04, 02),
Duration = "0",
Progress = 30
},
})
},
new TaskData() {
TaskId = 5,
TaskName = "Project estimation",
StartDate = new DateTime(2019, 04, 02),
EndDate = new DateTime(2019, 04, 21),
SubTasks = (new List <TaskData> () {
new TaskData() {
TaskId = 6,
TaskName = "Develop floor plan for estimation",
StartDate = new DateTime(2019, 04, 04),
Duration = "3",
Progress = 30,
},
new TaskData() {
TaskId = 7,
TaskName = "List materials",
StartDate = new DateTime(2019, 04, 04),
Duration = "3",
Progress = 40
},
new TaskData() {
TaskId = 8,
TaskName = "Estimation approval",
StartDate = new DateTime(2019, 04, 04),
Duration = "0",
Progress = 30,
}
})
}
};
return Tasks;
}
}
Created
Created event triggers when the Gantt Chart component is created. The Gantt Chart properties can be modified by using this event.
@using Syncfusion.Blazor.Gantt
<SfGantt DataSource="@TaskCollection" Height="450px" Width="900px">
<GanttTaskFields Id="TaskId" Name="TaskName" StartDate="StartDate" EndDate="EndDate"
Duration="Duration" Progress="Progress" Child="SubTasks">
</GanttTaskFields>
<GanttEvents TValue="TaskData" Created="CreatedHandler"></GanttEvents>
</SfGantt>
@code{
public SfGantt<TaskData> Gantt;
public void CreatedHandler(object args)
{
// Here you can customize your code
}
public List<TaskData> TaskCollection { get; set; }
protected override void OnInitialized()
{
this.TaskCollection = GetTaskCollection();
}
public class TaskData
{
public int TaskId { get; set; }
public string TaskName { get; set; }
public DateTime StartDate { get; set; }
public DateTime EndDate { get; set; }
public string Duration { get; set; }
public int Progress { get; set; }
public List<TaskData> SubTasks { get; set; }
}
public static List<TaskData> GetTaskCollection()
{
List<TaskData> Tasks = new List<TaskData>() {
new TaskData() {
TaskId = 1,
TaskName = "Project initiation",
StartDate = new DateTime(2019, 04, 02),
EndDate = new DateTime(2019, 04, 21),
SubTasks = (new List <TaskData> () {
new TaskData() {
TaskId = 2,
TaskName = "Identify Site location",
StartDate = new DateTime(2019, 04, 02),
Duration = "0",
Progress = 30,
},
new TaskData() {
TaskId = 3,
TaskName = "Perform soil test",
StartDate = new DateTime(2019, 04, 02),
Duration = "4",
Progress = 40,
},
new TaskData() {
TaskId = 4,
TaskName = "Soil test approval",
StartDate = new DateTime(2019, 04, 02),
Duration = "0",
Progress = 30
},
})
},
new TaskData() {
TaskId = 5,
TaskName = "Project estimation",
StartDate = new DateTime(2019, 04, 02),
EndDate = new DateTime(2019, 04, 21),
SubTasks = (new List <TaskData> () {
new TaskData() {
TaskId = 6,
TaskName = "Develop floor plan for estimation",
StartDate = new DateTime(2019, 04, 04),
Duration = "3",
Progress = 30,
},
new TaskData() {
TaskId = 7,
TaskName = "List materials",
StartDate = new DateTime(2019, 04, 04),
Duration = "3",
Progress = 40
},
new TaskData() {
TaskId = 8,
TaskName = "Estimation approval",
StartDate = new DateTime(2019, 04, 04),
Duration = "0",
Progress = 30,
}
})
}
};
return Tasks;
}
}
OnLoad
OnLoad event triggers before the rendering process starts which allows customization of Gantt Chart properties before the Gantt Chart rendering.
@using Syncfusion.Blazor.Gantt
<SfGantt DataSource="@TaskCollection" Height="450px" Width="900px">
<GanttTaskFields Id="TaskId" Name="TaskName" StartDate="StartDate" EndDate="EndDate"
Duration="Duration" Progress="Progress" Child="SubTasks">
</GanttTaskFields>
<GanttEvents TValue="TaskData" OnLoad="LoadHandler"></GanttEvents>
</SfGantt>
@code{
public SfGantt<TaskData> Gantt;
public void LoadHandler(object args)
{
// Here you can customize your code
}
public List<TaskData> TaskCollection { get; set; }
protected override void OnInitialized()
{
this.TaskCollection = GetTaskCollection();
}
public class TaskData
{
public int TaskId { get; set; }
public string TaskName { get; set; }
public DateTime StartDate { get; set; }
public DateTime EndDate { get; set; }
public string Duration { get; set; }
public int Progress { get; set; }
public List<TaskData> SubTasks { get; set; }
}
public static List<TaskData> GetTaskCollection()
{
List<TaskData> Tasks = new List<TaskData>() {
new TaskData() {
TaskId = 1,
TaskName = "Project initiation",
StartDate = new DateTime(2019, 04, 02),
EndDate = new DateTime(2019, 04, 21),
SubTasks = (new List <TaskData> () {
new TaskData() {
TaskId = 2,
TaskName = "Identify Site location",
StartDate = new DateTime(2019, 04, 02),
Duration = "0",
Progress = 30,
},
new TaskData() {
TaskId = 3,
TaskName = "Perform soil test",
StartDate = new DateTime(2019, 04, 02),
Duration = "4",
Progress = 40,
},
new TaskData() {
TaskId = 4,
TaskName = "Soil test approval",
StartDate = new DateTime(2019, 04, 02),
Duration = "0",
Progress = 30
},
})
},
new TaskData() {
TaskId = 5,
TaskName = "Project estimation",
StartDate = new DateTime(2019, 04, 02),
EndDate = new DateTime(2019, 04, 21),
SubTasks = (new List <TaskData> () {
new TaskData() {
TaskId = 6,
TaskName = "Develop floor plan for estimation",
StartDate = new DateTime(2019, 04, 04),
Duration = "3",
Progress = 30,
},
new TaskData() {
TaskId = 7,
TaskName = "List materials",
StartDate = new DateTime(2019, 04, 04),
Duration = "3",
Progress = 40
},
new TaskData() {
TaskId = 8,
TaskName = "Estimation approval",
StartDate = new DateTime(2019, 04, 04),
Duration = "0",
Progress = 30,
}
})
}
};
return Tasks;
}
}
Destroyed
Destroyed event triggers when the Gantt Chart component is destroyed. By using this event, confirm that the Gantt Chart gets destroyed.
@using Syncfusion.Blazor.Gantt
<SfGantt DataSource="@TaskCollection" Height="450px" Width="900px">
<GanttTaskFields Id="TaskId" Name="TaskName" StartDate="StartDate" EndDate="EndDate"
Duration="Duration" Progress="Progress" Child="SubTasks">
</GanttTaskFields>
<GanttEvents TValue="TaskData" Destroyed="DestroyHandler"></GanttEvents>
</SfGantt>
@code{
public SfGantt<TaskData> Gantt;
public void DestroyHandler(object args)
{
// Here you can customize your code
}
public List<TaskData> TaskCollection { get; set; }
protected override void OnInitialized()
{
this.TaskCollection = GetTaskCollection();
}
public class TaskData
{
public int TaskId { get; set; }
public string TaskName { get; set; }
public DateTime StartDate { get; set; }
public DateTime EndDate { get; set; }
public string Duration { get; set; }
public int Progress { get; set; }
public List<TaskData> SubTasks { get; set; }
}
public static List<TaskData> GetTaskCollection()
{
List<TaskData> Tasks = new List<TaskData>() {
new TaskData() {
TaskId = 1,
TaskName = "Project initiation",
StartDate = new DateTime(2019, 04, 02),
EndDate = new DateTime(2019, 04, 21),
SubTasks = (new List <TaskData> () {
new TaskData() {
TaskId = 2,
TaskName = "Identify Site location",
StartDate = new DateTime(2019, 04, 02),
Duration = "0",
Progress = 30,
},
new TaskData() {
TaskId = 3,
TaskName = "Perform soil test",
StartDate = new DateTime(2019, 04, 02),
Duration = "4",
Progress = 40,
},
new TaskData() {
TaskId = 4,
TaskName = "Soil test approval",
StartDate = new DateTime(2019, 04, 02),
Duration = "0",
Progress = 30
},
})
},
new TaskData() {
TaskId = 5,
TaskName = "Project estimation",
StartDate = new DateTime(2019, 04, 02),
EndDate = new DateTime(2019, 04, 21),
SubTasks = (new List <TaskData> () {
new TaskData() {
TaskId = 6,
TaskName = "Develop floor plan for estimation",
StartDate = new DateTime(2019, 04, 04),
Duration = "3",
Progress = 30,
},
new TaskData() {
TaskId = 7,
TaskName = "List materials",
StartDate = new DateTime(2019, 04, 04),
Duration = "3",
Progress = 40
},
new TaskData() {
TaskId = 8,
TaskName = "Estimation approval",
StartDate = new DateTime(2019, 04, 04),
Duration = "0",
Progress = 30,
}
})
}
};
return Tasks;
}
}
TaskbarEdited
TaskbarEdited event triggers when taskbar was dragged and dropped on a new position.
@using Syncfusion.Blazor.Gantt
<SfGantt DataSource="@TaskCollection" Height="450px" Width="900px">
<GanttTaskFields Id="TaskId" Name="TaskName" StartDate="StartDate" EndDate="EndDate"
Duration="Duration" Progress="Progress" Child="SubTasks">
</GanttTaskFields>
<GanttEditSettings AllowTaskbarEditing="true"></GanttEditSettings>
<GanttEvents TaskbarEdited="TaskbarEdited" TValue="TaskData"></GanttEvents>
</SfGantt>
@code{
public SfGantt<TaskData> Gantt;
public void TaskbarEdited(TaskbarEditedEventArgs<TaskData> args)
{
// Here you can get the error details in the args
}
public List<TaskData> TaskCollection { get; set; }
protected override void OnInitialized()
{
this.TaskCollection = GetTaskCollection();
}
public class TaskData
{
public int TaskId { get; set; }
public string TaskName { get; set; }
public DateTime StartDate { get; set; }
public DateTime EndDate { get; set; }
public string Duration { get; set; }
public int Progress { get; set; }
public List<TaskData> SubTasks { get; set; }
}
public static List<TaskData> GetTaskCollection()
{
List<TaskData> Tasks = new List<TaskData>() {
new TaskData() {
TaskId = 1,
TaskName = "Project initiation",
StartDate = new DateTime(2019, 04, 02),
EndDate = new DateTime(2019, 04, 21),
SubTasks = (new List <TaskData> () {
new TaskData() {
TaskId = 2,
TaskName = "Identify Site location",
StartDate = new DateTime(2019, 04, 02),
Duration = "0",
Progress = 30,
},
new TaskData() {
TaskId = 3,
TaskName = "Perform soil test",
StartDate = new DateTime(2019, 04, 02),
Duration = "4",
Progress = 40,
},
new TaskData() {
TaskId = 4,
TaskName = "Soil test approval",
StartDate = new DateTime(2019, 04, 02),
Duration = "0",
Progress = 30
},
})
},
new TaskData() {
TaskId = 5,
TaskName = "Project estimation",
StartDate = new DateTime(2019, 04, 02),
EndDate = new DateTime(2019, 04, 21),
SubTasks = (new List <TaskData> () {
new TaskData() {
TaskId = 6,
TaskName = "Develop floor plan for estimation",
StartDate = new DateTime(2019, 04, 04),
Duration = "3",
Progress = 30,
},
new TaskData() {
TaskId = 7,
TaskName = "List materials",
StartDate = new DateTime(2019, 04, 04),
Duration = "3",
Progress = 40
},
new TaskData() {
TaskId = 8,
TaskName = "Estimation approval",
StartDate = new DateTime(2019, 04, 04),
Duration = "0",
Progress = 30,
}
})
}
};
return Tasks;
}
}
RowDropped
RowDropped event triggers when row elements are dropped on the Gantt Chart.
@using Syncfusion.Blazor.Gantt
@using Syncfusion.Blazor.Grids
<SfGantt DataSource="@TaskCollection" Height="450px" Width="900px" AllowRowDragAndDrop="true">
<GanttTaskFields Id="TaskId" Name="TaskName" StartDate="StartDate" EndDate="EndDate"
Duration="Duration" Progress="Progress" Child="SubTasks">
</GanttTaskFields>
<GanttEditSettings AllowTaskbarEditing="true"></GanttEditSettings>
<GanttEvents RowDropped="RowDropped" TValue="TaskData"></GanttEvents>
</SfGantt>
@code{
public SfGantt<TaskData> Gantt;
public void RowDropped(RowDragEventArgs<TaskData> args)
{
// Here you can customize your code
}
public List<TaskData> TaskCollection { get; set; }
protected override void OnInitialized()
{
this.TaskCollection = GetTaskCollection();
}
public class TaskData
{
public int TaskId { get; set; }
public string TaskName { get; set; }
public DateTime StartDate { get; set; }
public DateTime EndDate { get; set; }
public string Duration { get; set; }
public int Progress { get; set; }
public List<TaskData> SubTasks { get; set; }
}
public static List<TaskData> GetTaskCollection()
{
List<TaskData> Tasks = new List<TaskData>() {
new TaskData() {
TaskId = 1,
TaskName = "Project initiation",
StartDate = new DateTime(2019, 04, 02),
EndDate = new DateTime(2019, 04, 21),
SubTasks = (new List <TaskData> () {
new TaskData() {
TaskId = 2,
TaskName = "Identify Site location",
StartDate = new DateTime(2019, 04, 02),
Duration = "0",
Progress = 30,
},
new TaskData() {
TaskId = 3,
TaskName = "Perform soil test",
StartDate = new DateTime(2019, 04, 02),
Duration = "4",
Progress = 40,
},
new TaskData() {
TaskId = 4,
TaskName = "Soil test approval",
StartDate = new DateTime(2019, 04, 02),
Duration = "0",
Progress = 30
},
})
},
new TaskData() {
TaskId = 5,
TaskName = "Project estimation",
StartDate = new DateTime(2019, 04, 02),
EndDate = new DateTime(2019, 04, 21),
SubTasks = (new List <TaskData> () {
new TaskData() {
TaskId = 6,
TaskName = "Develop floor plan for estimation",
StartDate = new DateTime(2019, 04, 04),
Duration = "3",
Progress = 30,
},
new TaskData() {
TaskId = 7,
TaskName = "List materials",
StartDate = new DateTime(2019, 04, 04),
Duration = "3",
Progress = 40
},
new TaskData() {
TaskId = 8,
TaskName = "Estimation approval",
StartDate = new DateTime(2019, 04, 04),
Duration = "0",
Progress = 30,
}
})
}
};
return Tasks;
}
}
RowDataBound
RowDataBound event triggers every time a request is made to access row information, element, or data and before the row element is appended to the Gantt Chart element.
@using Syncfusion.Blazor.Gantt
@using Syncfusion.Blazor.Grids
<SfGantt DataSource="@TaskCollection" Height="450px" Width="900px">
<GanttTaskFields Id="TaskId" Name="TaskName" StartDate="StartDate" EndDate="EndDate"
Duration="Duration" Progress="Progress" Child="SubTasks">
</GanttTaskFields>
<GanttEditSettings AllowTaskbarEditing="true"></GanttEditSettings>
<GanttEvents RowDataBound="RowDataBoundHandler" TValue="TaskData"></GanttEvents>
</SfGantt>
@code{
public SfGantt<TaskData> Gantt;
public void RowDataBoundHandler(RowDataBoundEventArgs<TaskData> args)
{
// Here you can customize your code
}
public List<TaskData> TaskCollection { get; set; }
protected override void OnInitialized()
{
this.TaskCollection = GetTaskCollection();
}
public class TaskData
{
public int TaskId { get; set; }
public string TaskName { get; set; }
public DateTime StartDate { get; set; }
public DateTime EndDate { get; set; }
public string Duration { get; set; }
public int Progress { get; set; }
public List<TaskData> SubTasks { get; set; }
}
public static List<TaskData> GetTaskCollection()
{
List<TaskData> Tasks = new List<TaskData>() {
new TaskData() {
TaskId = 1,
TaskName = "Project initiation",
StartDate = new DateTime(2019, 04, 02),
EndDate = new DateTime(2019, 04, 21),
SubTasks = (new List <TaskData> () {
new TaskData() {
TaskId = 2,
TaskName = "Identify Site location",
StartDate = new DateTime(2019, 04, 02),
Duration = "0",
Progress = 30,
},
new TaskData() {
TaskId = 3,
TaskName = "Perform soil test",
StartDate = new DateTime(2019, 04, 02),
Duration = "4",
Progress = 40,
},
new TaskData() {
TaskId = 4,
TaskName = "Soil test approval",
StartDate = new DateTime(2019, 04, 02),
Duration = "0",
Progress = 30
},
})
},
new TaskData() {
TaskId = 5,
TaskName = "Project estimation",
StartDate = new DateTime(2019, 04, 02),
EndDate = new DateTime(2019, 04, 21),
SubTasks = (new List <TaskData> () {
new TaskData() {
TaskId = 6,
TaskName = "Develop floor plan for estimation",
StartDate = new DateTime(2019, 04, 04),
Duration = "3",
Progress = 30,
},
new TaskData() {
TaskId = 7,
TaskName = "List materials",
StartDate = new DateTime(2019, 04, 04),
Duration = "3",
Progress = 40
},
new TaskData() {
TaskId = 8,
TaskName = "Estimation approval",
StartDate = new DateTime(2019, 04, 04),
Duration = "0",
Progress = 30,
}
})
}
};
return Tasks;
}
}
OnRowDragStart
OnRowDragStart event triggers when row elements drag starts.
@using Syncfusion.Blazor.Gantt
@using Syncfusion.Blazor.Grids
<SfGantt DataSource="@TaskCollection" Height="450px" Width="900px" AllowRowDragAndDrop="true">
<GanttTaskFields Id="TaskId" Name="TaskName" StartDate="StartDate" EndDate="EndDate"
Duration="Duration" Progress="Progress" Child="SubTasks">
</GanttTaskFields>
<GanttEditSettings AllowTaskbarEditing="true"></GanttEditSettings>
<GanttEvents OnRowDragStart="OnRowDragStart" TValue="TaskData"></GanttEvents>
</SfGantt>
@code{
public SfGantt<TaskData> Gantt;
public void OnRowDragStart(RowDragEventArgs<TaskData> args)
{
// Here you can customize your code
}
public List<TaskData> TaskCollection { get; set; }
protected override void OnInitialized()
{
this.TaskCollection = GetTaskCollection();
}
public class TaskData
{
public int TaskId { get; set; }
public string TaskName { get; set; }
public DateTime StartDate { get; set; }
public DateTime EndDate { get; set; }
public string Duration { get; set; }
public int Progress { get; set; }
public List<TaskData> SubTasks { get; set; }
}
public static List<TaskData> GetTaskCollection()
{
List<TaskData> Tasks = new List<TaskData>() {
new TaskData() {
TaskId = 1,
TaskName = "Project initiation",
StartDate = new DateTime(2019, 04, 02),
EndDate = new DateTime(2019, 04, 21),
SubTasks = (new List <TaskData> () {
new TaskData() {
TaskId = 2,
TaskName = "Identify Site location",
StartDate = new DateTime(2019, 04, 02),
Duration = "0",
Progress = 30,
},
new TaskData() {
TaskId = 3,
TaskName = "Perform soil test",
StartDate = new DateTime(2019, 04, 02),
Duration = "4",
Progress = 40,
},
new TaskData() {
TaskId = 4,
TaskName = "Soil test approval",
StartDate = new DateTime(2019, 04, 02),
Duration = "0",
Progress = 30
},
})
},
new TaskData() {
TaskId = 5,
TaskName = "Project estimation",
StartDate = new DateTime(2019, 04, 02),
EndDate = new DateTime(2019, 04, 21),
SubTasks = (new List <TaskData> () {
new TaskData() {
TaskId = 6,
TaskName = "Develop floor plan for estimation",
StartDate = new DateTime(2019, 04, 04),
Duration = "3",
Progress = 30,
},
new TaskData() {
TaskId = 7,
TaskName = "List materials",
StartDate = new DateTime(2019, 04, 04),
Duration = "3",
Progress = 40
},
new TaskData() {
TaskId = 8,
TaskName = "Estimation approval",
StartDate = new DateTime(2019, 04, 04),
Duration = "0",
Progress = 30,
}
})
}
};
return Tasks;
}
}
QueryChartRowInfo
QueryChartRowInfo event triggers during the rendering of Taskbar in the Gantt Chart so that the Chart rows can be customized.
@using Syncfusion.Blazor.Gantt
<SfGantt DataSource="@TaskCollection" Height="450px" Width="900px">
<GanttTaskFields Id="TaskId" Name="TaskName" StartDate="StartDate" EndDate="EndDate"
Duration="Duration" Progress="Progress" Child="SubTasks">
</GanttTaskFields>
<GanttEditSettings AllowTaskbarEditing="true"></GanttEditSettings>
<GanttEvents QueryChartRowInfo ="QueryChartRowInfo" TValue="TaskData"></GanttEvents>
</SfGantt>
@code{
public SfGantt<TaskData> Gantt;
public void QueryChartRowInfo(QueryChartRowInfoEventArgs<TaskData> args)
{
// Here you can get the error details in the args
}
public List<TaskData> TaskCollection { get; set; }
protected override void OnInitialized()
{
this.TaskCollection = GetTaskCollection();
}
public class TaskData
{
public int TaskId { get; set; }
public string TaskName { get; set; }
public DateTime StartDate { get; set; }
public DateTime EndDate { get; set; }
public string Duration { get; set; }
public int Progress { get; set; }
public List<TaskData> SubTasks { get; set; }
}
public static List<TaskData> GetTaskCollection()
{
List<TaskData> Tasks = new List<TaskData>() {
new TaskData() {
TaskId = 1,
TaskName = "Project initiation",
StartDate = new DateTime(2019, 04, 02),
EndDate = new DateTime(2019, 04, 21),
SubTasks = (new List <TaskData> () {
new TaskData() {
TaskId = 2,
TaskName = "Identify Site location",
StartDate = new DateTime(2019, 04, 02),
Duration = "0",
Progress = 30,
},
new TaskData() {
TaskId = 3,
TaskName = "Perform soil test",
StartDate = new DateTime(2019, 04, 02),
Duration = "4",
Progress = 40,
},
new TaskData() {
TaskId = 4,
TaskName = "Soil test approval",
StartDate = new DateTime(2019, 04, 02),
Duration = "0",
Progress = 30
},
})
},
new TaskData() {
TaskId = 5,
TaskName = "Project estimation",
StartDate = new DateTime(2019, 04, 02),
EndDate = new DateTime(2019, 04, 21),
SubTasks = (new List <TaskData> () {
new TaskData() {
TaskId = 6,
TaskName = "Develop floor plan for estimation",
StartDate = new DateTime(2019, 04, 04),
Duration = "3",
Progress = 30,
},
new TaskData() {
TaskId = 7,
TaskName = "List materials",
StartDate = new DateTime(2019, 04, 04),
Duration = "3",
Progress = 40
},
new TaskData() {
TaskId = 8,
TaskName = "Estimation approval",
StartDate = new DateTime(2019, 04, 04),
Duration = "0",
Progress = 30,
}
})
}
};
return Tasks;
}
}
QueryCellInfo
QueryCellInfo event triggers every time a request is made to access cell information, element, or data and before the cell element is appended to the Gantt Chart element.
@using Syncfusion.Blazor.Gantt
@using Syncfusion.Blazor.Grids
<SfGantt DataSource="@TaskCollection" Height="450px" Width="900px">
<GanttTaskFields Id="TaskId" Name="TaskName" StartDate="StartDate" EndDate="EndDate"
Duration="Duration" Progress="Progress" Child="SubTasks">
</GanttTaskFields>
<GanttEditSettings AllowEditing="true" Mode="Syncfusion.Blazor.Gantt.EditMode.Auto"></GanttEditSettings>
<GanttEvents TValue="TaskData" QueryCellInfo="QueryCellInfoHandler"></GanttEvents>
</SfGantt>
@code{
public SfGantt<TaskData> Gantt;
public void QueryCellInfoHandler(QueryCellInfoEventArgs<TaskData> args)
{
// Here you can customize your code
}
public List<TaskData> TaskCollection { get; set; }
protected override void OnInitialized()
{
this.TaskCollection = GetTaskCollection();
}
public class TaskData
{
public int TaskId { get; set; }
public string TaskName { get; set; }
public DateTime StartDate { get; set; }
public DateTime EndDate { get; set; }
public string Duration { get; set; }
public int Progress { get; set; }
public List<TaskData> SubTasks { get; set; }
}
public static List<TaskData> GetTaskCollection()
{
List<TaskData> Tasks = new List<TaskData>() {
new TaskData() {
TaskId = 1,
TaskName = "Project initiation",
StartDate = new DateTime(2019, 04, 02),
EndDate = new DateTime(2019, 04, 21),
SubTasks = (new List <TaskData> () {
new TaskData() {
TaskId = 2,
TaskName = "Identify Site location",
StartDate = new DateTime(2019, 04, 02),
Duration = "0",
Progress = 30,
},
new TaskData() {
TaskId = 3,
TaskName = "Perform soil test",
StartDate = new DateTime(2019, 04, 02),
Duration = "4",
Progress = 40,
},
new TaskData() {
TaskId = 4,
TaskName = "Soil test approval",
StartDate = new DateTime(2019, 04, 02),
Duration = "0",
Progress = 30
},
})
},
new TaskData() {
TaskId = 5,
TaskName = "Project estimation",
StartDate = new DateTime(2019, 04, 02),
EndDate = new DateTime(2019, 04, 21),
SubTasks = (new List <TaskData> () {
new TaskData() {
TaskId = 6,
TaskName = "Develop floor plan for estimation",
StartDate = new DateTime(2019, 04, 04),
Duration = "3",
Progress = 30,
},
new TaskData() {
TaskId = 7,
TaskName = "List materials",
StartDate = new DateTime(2019, 04, 04),
Duration = "3",
Progress = 40
},
new TaskData() {
TaskId = 8,
TaskName = "Estimation approval",
StartDate = new DateTime(2019, 04, 04),
Duration = "0",
Progress = 30,
}
})
}
};
return Tasks;
}
}
EndEdit
EndEdit event triggers when a task gets saved by cell edit.
@using Syncfusion.Blazor.Gantt
<SfGantt DataSource="@TaskCollection" Height="450px" Width="900px">
<GanttTaskFields Id="TaskId" Name="TaskName" StartDate="StartDate" EndDate="EndDate"
Duration="Duration" Progress="Progress" Child="SubTasks">
</GanttTaskFields>
<GanttEditSettings AllowTaskbarEditing="true"></GanttEditSettings>
<GanttEvents EndEdit ="EndEdit" TValue="TaskData"></GanttEvents>
</SfGantt>
@code{
public SfGantt<TaskData> Gantt;
public void EndEdit(TaskbarEditedEventArgs<TaskData> args)
{
// Here you can get the error details in the args
}
public List<TaskData> TaskCollection { get; set; }
protected override void OnInitialized()
{
this.TaskCollection = GetTaskCollection();
}
public class TaskData
{
public int TaskId { get; set; }
public string TaskName { get; set; }
public DateTime StartDate { get; set; }
public DateTime EndDate { get; set; }
public string Duration { get; set; }
public int Progress { get; set; }
public List<TaskData> SubTasks { get; set; }
}
public static List<TaskData> GetTaskCollection()
{
List<TaskData> Tasks = new List<TaskData>() {
new TaskData() {
TaskId = 1,
TaskName = "Project initiation",
StartDate = new DateTime(2019, 04, 02),
EndDate = new DateTime(2019, 04, 21),
SubTasks = (new List <TaskData> () {
new TaskData() {
TaskId = 2,
TaskName = "Identify Site location",
StartDate = new DateTime(2019, 04, 02),
Duration = "0",
Progress = 30,
},
new TaskData() {
TaskId = 3,
TaskName = "Perform soil test",
StartDate = new DateTime(2019, 04, 02),
Duration = "4",
Progress = 40,
},
new TaskData() {
TaskId = 4,
TaskName = "Soil test approval",
StartDate = new DateTime(2019, 04, 02),
Duration = "0",
Progress = 30
},
})
},
new TaskData() {
TaskId = 5,
TaskName = "Project estimation",
StartDate = new DateTime(2019, 04, 02),
EndDate = new DateTime(2019, 04, 21),
SubTasks = (new List <TaskData> () {
new TaskData() {
TaskId = 6,
TaskName = "Develop floor plan for estimation",
StartDate = new DateTime(2019, 04, 04),
Duration = "3",
Progress = 30,
},
new TaskData() {
TaskId = 7,
TaskName = "List materials",
StartDate = new DateTime(2019, 04, 04),
Duration = "3",
Progress = 40
},
new TaskData() {
TaskId = 8,
TaskName = "Estimation approval",
StartDate = new DateTime(2019, 04, 04),
Duration = "0",
Progress = 30,
}
})
}
};
return Tasks;
}
}
BeforeTooltipRender
BeforeTooltipRender event triggers before tooltip gets rendered.
@using Syncfusion.Blazor.Gantt
<SfGantt DataSource="@TaskCollection" Height="450px" Width="900px">
<GanttTaskFields Id="TaskId" Name="TaskName" StartDate="StartDate" EndDate="EndDate"
Duration="Duration" Progress="Progress" Child="SubTasks">
</GanttTaskFields>
<GanttEditSettings AllowTaskbarEditing="true"></GanttEditSettings>
<GanttEvents BeforeTooltipRender ="BeforeTooltipRender" TValue="TaskData"></GanttEvents>
</SfGantt>
@code{
public SfGantt<TaskData> Gantt;
public void BeforeTooltipRender(BeforeTooltipRenderEventArgs<TaskData> args)
{
// Here you can get the error details in the args
}
public List<TaskData> TaskCollection { get; set; }
protected override void OnInitialized()
{
this.TaskCollection = GetTaskCollection();
}
public class TaskData
{
public int TaskId { get; set; }
public string TaskName { get; set; }
public DateTime StartDate { get; set; }
public DateTime EndDate { get; set; }
public string Duration { get; set; }
public int Progress { get; set; }
public List<TaskData> SubTasks { get; set; }
}
public static List<TaskData> GetTaskCollection()
{
List<TaskData> Tasks = new List<TaskData>() {
new TaskData() {
TaskId = 1,
TaskName = "Project initiation",
StartDate = new DateTime(2019, 04, 02),
EndDate = new DateTime(2019, 04, 21),
SubTasks = (new List <TaskData> () {
new TaskData() {
TaskId = 2,
TaskName = "Identify Site location",
StartDate = new DateTime(2019, 04, 02),
Duration = "0",
Progress = 30,
},
new TaskData() {
TaskId = 3,
TaskName = "Perform soil test",
StartDate = new DateTime(2019, 04, 02),
Duration = "4",
Progress = 40,
},
new TaskData() {
TaskId = 4,
TaskName = "Soil test approval",
StartDate = new DateTime(2019, 04, 02),
Duration = "0",
Progress = 30
},
})
},
new TaskData() {
TaskId = 5,
TaskName = "Project estimation",
StartDate = new DateTime(2019, 04, 02),
EndDate = new DateTime(2019, 04, 21),
SubTasks = (new List <TaskData> () {
new TaskData() {
TaskId = 6,
TaskName = "Develop floor plan for estimation",
StartDate = new DateTime(2019, 04, 04),
Duration = "3",
Progress = 30,
},
new TaskData() {
TaskId = 7,
TaskName = "List materials",
StartDate = new DateTime(2019, 04, 04),
Duration = "3",
Progress = 40
},
new TaskData() {
TaskId = 8,
TaskName = "Estimation approval",
StartDate = new DateTime(2019, 04, 04),
Duration = "0",
Progress = 30,
}
})
}
};
return Tasks;
}
}
SplitterResizeStart
SplitterResizeStart event triggers when column resize starts.
@using Syncfusion.Blazor.Gantt
@using Syncfusion.Blazor.Layouts
<SfGantt DataSource="@TaskCollection" Height="450px" Width="900px" AllowRowDragAndDrop="true">
<GanttTaskFields Id="TaskId" Name="TaskName" StartDate="StartDate" EndDate="EndDate"
Duration="Duration" Progress="Progress" Child="SubTasks">
</GanttTaskFields>
<GanttEditSettings AllowTaskbarEditing="true"></GanttEditSettings>
<GanttEvents SplitterResizeStart="Resizestart" TValue="TaskData"></GanttEvents>
</SfGantt>
@code{
public SfGantt<TaskData> Gantt;
public void Resizestart(Syncfusion.Blazor.Layouts.ResizeEventArgs args)
{
// Here you can customize your code
}
public List<TaskData> TaskCollection { get; set; }
protected override void OnInitialized()
{
this.TaskCollection = GetTaskCollection();
}
public class TaskData
{
public int TaskId { get; set; }
public string TaskName { get; set; }
public DateTime StartDate { get; set; }
public DateTime EndDate { get; set; }
public string Duration { get; set; }
public int Progress { get; set; }
public List<TaskData> SubTasks { get; set; }
}
public static List<TaskData> GetTaskCollection()
{
List<TaskData> Tasks = new List<TaskData>() {
new TaskData() {
TaskId = 1,
TaskName = "Project initiation",
StartDate = new DateTime(2019, 04, 02),
EndDate = new DateTime(2019, 04, 21),
SubTasks = (new List <TaskData> () {
new TaskData() {
TaskId = 2,
TaskName = "Identify Site location",
StartDate = new DateTime(2019, 04, 02),
Duration = "0",
Progress = 30,
},
new TaskData() {
TaskId = 3,
TaskName = "Perform soil test",
StartDate = new DateTime(2019, 04, 02),
Duration = "4",
Progress = 40,
},
new TaskData() {
TaskId = 4,
TaskName = "Soil test approval",
StartDate = new DateTime(2019, 04, 02),
Duration = "0",
Progress = 30
},
})
},
new TaskData() {
TaskId = 5,
TaskName = "Project estimation",
StartDate = new DateTime(2019, 04, 02),
EndDate = new DateTime(2019, 04, 21),
SubTasks = (new List <TaskData> () {
new TaskData() {
TaskId = 6,
TaskName = "Develop floor plan for estimation",
StartDate = new DateTime(2019, 04, 04),
Duration = "3",
Progress = 30,
},
new TaskData() {
TaskId = 7,
TaskName = "List materials",
StartDate = new DateTime(2019, 04, 04),
Duration = "3",
Progress = 40
},
new TaskData() {
TaskId = 8,
TaskName = "Estimation approval",
StartDate = new DateTime(2019, 04, 04),
Duration = "0",
Progress = 30,
}
})
}
};
return Tasks;
}
}
SplitterResized
SplitterResized event triggers when column resize ends.
@using Syncfusion.Blazor.Gantt
@using Syncfusion.Blazor.Layouts
<SfGantt DataSource="@TaskCollection" Height="450px" Width="900px" AllowRowDragAndDrop="true">
<GanttTaskFields Id="TaskId" Name="TaskName" StartDate="StartDate" EndDate="EndDate"
Duration="Duration" Progress="Progress" Child="SubTasks">
</GanttTaskFields>
<GanttEditSettings AllowTaskbarEditing="true"></GanttEditSettings>
<GanttEvents SplitterResized="Resized" TValue="TaskData"></GanttEvents>
</SfGantt>
@code{
public SfGantt<TaskData> Gantt;
public void Resized(Syncfusion.Blazor.Layouts.ResizingEventArgs args)
{
// Here you can customize your code
}
public List<TaskData> TaskCollection { get; set; }
protected override void OnInitialized()
{
this.TaskCollection = GetTaskCollection();
}
public class TaskData
{
public int TaskId { get; set; }
public string TaskName { get; set; }
public DateTime StartDate { get; set; }
public DateTime EndDate { get; set; }
public string Duration { get; set; }
public int Progress { get; set; }
public List<TaskData> SubTasks { get; set; }
}
public static List<TaskData> GetTaskCollection()
{
List<TaskData> Tasks = new List<TaskData>() {
new TaskData() {
TaskId = 1,
TaskName = "Project initiation",
StartDate = new DateTime(2019, 04, 02),
EndDate = new DateTime(2019, 04, 21),
SubTasks = (new List <TaskData> () {
new TaskData() {
TaskId = 2,
TaskName = "Identify Site location",
StartDate = new DateTime(2019, 04, 02),
Duration = "0",
Progress = 30,
},
new TaskData() {
TaskId = 3,
TaskName = "Perform soil test",
StartDate = new DateTime(2019, 04, 02),
Duration = "4",
Progress = 40,
},
new TaskData() {
TaskId = 4,
TaskName = "Soil test approval",
StartDate = new DateTime(2019, 04, 02),
Duration = "0",
Progress = 30
},
})
},
new TaskData() {
TaskId = 5,
TaskName = "Project estimation",
StartDate = new DateTime(2019, 04, 02),
EndDate = new DateTime(2019, 04, 21),
SubTasks = (new List <TaskData> () {
new TaskData() {
TaskId = 6,
TaskName = "Develop floor plan for estimation",
StartDate = new DateTime(2019, 04, 04),
Duration = "3",
Progress = 30,
},
new TaskData() {
TaskId = 7,
TaskName = "List materials",
StartDate = new DateTime(2019, 04, 04),
Duration = "3",
Progress = 40
},
new TaskData() {
TaskId = 8,
TaskName = "Estimation approval",
StartDate = new DateTime(2019, 04, 04),
Duration = "0",
Progress = 30,
}
})
}
};
return Tasks;
}
}
OnCellEdit
OnCellEdit event triggers when the cell is being edited.
@using Syncfusion.Blazor.Gantt
@using Syncfusion.Blazor.Grids
<SfGantt DataSource="@TaskCollection" Height="450px" Width="900px">
<GanttTaskFields Id="TaskId" Name="TaskName" StartDate="StartDate" EndDate="EndDate"
Duration="Duration" Progress="Progress" Child="SubTasks">
</GanttTaskFields>
<GanttEditSettings AllowEditing="true" Mode="Syncfusion.Blazor.Gantt.EditMode.Auto"></GanttEditSettings>
<GanttEvents TValue="TaskData" OnCellEdit="CellEditHandler"></GanttEvents>
</SfGantt>
@code{
public SfGantt<TaskData> Gantt;
public void CellEditHandler(CellEditArgs<TaskData> args)
{
// Here you can customize your code
}
public List<TaskData> TaskCollection { get; set; }
protected override void OnInitialized()
{
this.TaskCollection = GetTaskCollection();
}
public class TaskData
{
public int TaskId { get; set; }
public string TaskName { get; set; }
public DateTime StartDate { get; set; }
public DateTime EndDate { get; set; }
public string Duration { get; set; }
public int Progress { get; set; }
public List<TaskData> SubTasks { get; set; }
}
public static List<TaskData> GetTaskCollection()
{
List<TaskData> Tasks = new List<TaskData>() {
new TaskData() {
TaskId = 1,
TaskName = "Project initiation",
StartDate = new DateTime(2019, 04, 02),
EndDate = new DateTime(2019, 04, 21),
SubTasks = (new List <TaskData> () {
new TaskData() {
TaskId = 2,
TaskName = "Identify Site location",
StartDate = new DateTime(2019, 04, 02),
Duration = "0",
Progress = 30,
},
new TaskData() {
TaskId = 3,
TaskName = "Perform soil test",
StartDate = new DateTime(2019, 04, 02),
Duration = "4",
Progress = 40,
},
new TaskData() {
TaskId = 4,
TaskName = "Soil test approval",
StartDate = new DateTime(2019, 04, 02),
Duration = "0",
Progress = 30
},
})
},
new TaskData() {
TaskId = 5,
TaskName = "Project estimation",
StartDate = new DateTime(2019, 04, 02),
EndDate = new DateTime(2019, 04, 21),
SubTasks = (new List <TaskData> () {
new TaskData() {
TaskId = 6,
TaskName = "Develop floor plan for estimation",
StartDate = new DateTime(2019, 04, 04),
Duration = "3",
Progress = 30,
},
new TaskData() {
TaskId = 7,
TaskName = "List materials",
StartDate = new DateTime(2019, 04, 04),
Duration = "3",
Progress = 40
},
new TaskData() {
TaskId = 8,
TaskName = "Estimation approval",
StartDate = new DateTime(2019, 04, 04),
Duration = "0",
Progress = 30,
}
})
}
};
return Tasks;
}
}
SplitterResizing
SplitterResizing event triggers when the splitter bar is dragged.
@using Syncfusion.Blazor.Gantt
@using Syncfusion.Blazor.Layouts
<SfGantt DataSource="@TaskCollection" Height="450px" Width="900px" AllowRowDragAndDrop="true">
<GanttTaskFields Id="TaskId" Name="TaskName" StartDate="StartDate" EndDate="EndDate"
Duration="Duration" Progress="Progress" Child="SubTasks">
</GanttTaskFields>
<GanttEditSettings AllowTaskbarEditing="true"></GanttEditSettings>
<GanttEvents SplitterResizing ="Resized" TValue="TaskData"></GanttEvents>
</SfGantt>
@code{
public SfGantt<TaskData> Gantt;
public void Resized(Syncfusion.Blazor.Layouts.ResizingEventArgs args)
{
// Here you can customize your code
}
public List<TaskData> TaskCollection { get; set; }
protected override void OnInitialized()
{
this.TaskCollection = GetTaskCollection();
}
public class TaskData
{
public int TaskId { get; set; }
public string TaskName { get; set; }
public DateTime StartDate { get; set; }
public DateTime EndDate { get; set; }
public string Duration { get; set; }
public int Progress { get; set; }
public List<TaskData> SubTasks { get; set; }
}
public static List<TaskData> GetTaskCollection()
{
List<TaskData> Tasks = new List<TaskData>() {
new TaskData() {
TaskId = 1,
TaskName = "Project initiation",
StartDate = new DateTime(2019, 04, 02),
EndDate = new DateTime(2019, 04, 21),
SubTasks = (new List <TaskData> () {
new TaskData() {
TaskId = 2,
TaskName = "Identify Site location",
StartDate = new DateTime(2019, 04, 02),
Duration = "0",
Progress = 30,
},
new TaskData() {
TaskId = 3,
TaskName = "Perform soil test",
StartDate = new DateTime(2019, 04, 02),
Duration = "4",
Progress = 40,
},
new TaskData() {
TaskId = 4,
TaskName = "Soil test approval",
StartDate = new DateTime(2019, 04, 02),
Duration = "0",
Progress = 30
},
})
},
new TaskData() {
TaskId = 5,
TaskName = "Project estimation",
StartDate = new DateTime(2019, 04, 02),
EndDate = new DateTime(2019, 04, 21),
SubTasks = (new List <TaskData> () {
new TaskData() {
TaskId = 6,
TaskName = "Develop floor plan for estimation",
StartDate = new DateTime(2019, 04, 04),
Duration = "3",
Progress = 30,
},
new TaskData() {
TaskId = 7,
TaskName = "List materials",
StartDate = new DateTime(2019, 04, 04),
Duration = "3",
Progress = 40
},
new TaskData() {
TaskId = 8,
TaskName = "Estimation approval",
StartDate = new DateTime(2019, 04, 04),
Duration = "0",
Progress = 30,
}
})
}
};
return Tasks;
}
}
RowSelecting
RowSelecting event triggers before row selection occurs.
@using Syncfusion.Blazor.Gantt
@using Syncfusion.Blazor.Grids
<SfGantt DataSource="@TaskCollection" Height="450px" Width="900px">
<GanttTaskFields Id="TaskId" Name="TaskName" StartDate="StartDate" EndDate="EndDate"
Duration="Duration" Progress="Progress" Child="SubTasks">
</GanttTaskFields>
<GanttSelectionSettings Mode="SelectionMode.Row"></GanttSelectionSettings>
<GanttEvents TValue="TaskData" RowSelecting="RowSelectingHandler"></GanttEvents>
</SfGantt>
@code{
public SfGantt<TaskData> Gantt;
public void RowSelectingHandler(RowSelectingEventArgs<TaskData> args)
{
// Here you can customize your code
}
public List<TaskData> TaskCollection { get; set; }
protected override void OnInitialized()
{
this.TaskCollection = GetTaskCollection();
}
public class TaskData
{
public int TaskId { get; set; }
public string TaskName { get; set; }
public DateTime StartDate { get; set; }
public DateTime EndDate { get; set; }
public string Duration { get; set; }
public int Progress { get; set; }
public List<TaskData> SubTasks { get; set; }
}
public static List<TaskData> GetTaskCollection()
{
List<TaskData> Tasks = new List<TaskData>() {
new TaskData() {
TaskId = 1,
TaskName = "Project initiation",
StartDate = new DateTime(2019, 04, 02),
EndDate = new DateTime(2019, 04, 21),
SubTasks = (new List <TaskData> () {
new TaskData() {
TaskId = 2,
TaskName = "Identify Site location",
StartDate = new DateTime(2019, 04, 02),
Duration = "0",
Progress = 30,
},
new TaskData() {
TaskId = 3,
TaskName = "Perform soil test",
StartDate = new DateTime(2019, 04, 02),
Duration = "4",
Progress = 40,
},
new TaskData() {
TaskId = 4,
TaskName = "Soil test approval",
StartDate = new DateTime(2019, 04, 02),
Duration = "0",
Progress = 30
},
})
},
new TaskData() {
TaskId = 5,
TaskName = "Project estimation",
StartDate = new DateTime(2019, 04, 02),
EndDate = new DateTime(2019, 04, 21),
SubTasks = (new List <TaskData> () {
new TaskData() {
TaskId = 6,
TaskName = "Develop floor plan for estimation",
StartDate = new DateTime(2019, 04, 04),
Duration = "3",
Progress = 30,
},
new TaskData() {
TaskId = 7,
TaskName = "List materials",
StartDate = new DateTime(2019, 04, 04),
Duration = "3",
Progress = 40
},
new TaskData() {
TaskId = 8,
TaskName = "Estimation approval",
StartDate = new DateTime(2019, 04, 04),
Duration = "0",
Progress = 30,
}
})
}
};
return Tasks;
}
}
RowSelected
RowSelected event triggers when a row is selected.
@using Syncfusion.Blazor.Gantt
@using Syncfusion.Blazor.Grids
<SfGantt @ref="Gantt" DataSource="@TaskCollection" Height="450px" Width="700px">
<GanttTaskFields Id="TaskId" Name="TaskName" StartDate="StartDate" EndDate="EndDate" Duration="Duration" Progress="Progress" Child="SubTasks">
</GanttTaskFields>
<GanttSelectionSettings Mode="SelectionMode.Row" Type="Syncfusion.Blazor.Grids.SelectionType.Multiple"></GanttSelectionSettings>
<GanttEvents TValue="TaskData" RowSelected="rowSelect"></GanttEvents>
</SfGantt>
@code{
public SfGantt<TaskData> Gantt;
public void rowSelect(RowSelectEventArgs<TaskData> args)
{
//Here you can customize your code
}
public List<TaskData> TaskCollection { get; set; }
protected override void OnInitialized()
{
this.TaskCollection = GetTaskCollection();
}
public class TaskData
{
public int TaskId { get; set; }
public string TaskName { get; set; }
public DateTime StartDate { get; set; }
public DateTime EndDate { get; set; }
public string Duration { get; set; }
public int Progress { get; set; }
public List<TaskData> SubTasks { get; set; }
}
public static List<TaskData> GetTaskCollection()
{
List<TaskData> Tasks = new List<TaskData>() {
new TaskData() {
TaskId = 1,
TaskName = "Project initiation",
StartDate = new DateTime(2019, 04, 02),
EndDate = new DateTime(2019, 04, 21),
SubTasks = (new List <TaskData> () {
new TaskData() {
TaskId = 2,
TaskName = "Identify Site location",
StartDate = new DateTime(2019, 04, 02),
Duration = "3",
Progress = 30,
},
new TaskData() {
TaskId = 3,
TaskName = "Perform soil test",
StartDate = new DateTime(2019, 04, 02),
Duration = "4",
Progress = 40,
},
new TaskData() {
TaskId = 4,
TaskName = "Soil test approval",
StartDate = new DateTime(2019, 04, 02),
Duration = "0",
Progress = 30
},
})
},
new TaskData() {
TaskId = 5,
TaskName = "Project estimation",
StartDate = new DateTime(2019, 04, 02),
EndDate = new DateTime(2019, 04, 21),
SubTasks = (new List <TaskData> () {
new TaskData() {
TaskId = 6,
TaskName = "Develop floor plan for estimation",
StartDate = new DateTime(2019, 04, 04),
Duration = "3",
Progress = 30,
},
new TaskData() {
TaskId = 7,
TaskName = "List materials",
StartDate = new DateTime(2019, 04, 04),
Duration = "3",
Progress = 40
},
new TaskData() {
TaskId = 8,
TaskName = "Estimation approval",
StartDate = new DateTime(2019, 04, 04),
Duration = "0",
Progress = 30,
}
})
}
};
return Tasks;
}
}
RowDeselecting
RowDeselecting event triggers before a selected row is being deselected.
@using Syncfusion.Blazor.Gantt
@using Syncfusion.Blazor.Grids
<SfGantt DataSource="@TaskCollection" Height="450px" Width="900px">
<GanttTaskFields Id="TaskId" Name="TaskName" StartDate="StartDate" EndDate="EndDate"
Duration="Duration" Progress="Progress" Child="SubTasks">
</GanttTaskFields>
<GanttSelectionSettings Mode="SelectionMode.Row"></GanttSelectionSettings>
<GanttEvents TValue="TaskData" RowDeselecting="RowDeselectingHandler"></GanttEvents>
</SfGantt>
@code{
public SfGantt<TaskData> Gantt;
public void RowDeselectingHandler(RowDeselectEventArgs<TaskData> args)
{
// Here you can customize your code
}
public List<TaskData> TaskCollection { get; set; }
protected override void OnInitialized()
{
this.TaskCollection = GetTaskCollection();
}
public class TaskData
{
public int TaskId { get; set; }
public string TaskName { get; set; }
public DateTime StartDate { get; set; }
public DateTime EndDate { get; set; }
public string Duration { get; set; }
public int Progress { get; set; }
public List<TaskData> SubTasks { get; set; }
}
public static List<TaskData> GetTaskCollection()
{
List<TaskData> Tasks = new List<TaskData>() {
new TaskData() {
TaskId = 1,
TaskName = "Project initiation",
StartDate = new DateTime(2019, 04, 02),
EndDate = new DateTime(2019, 04, 21),
SubTasks = (new List <TaskData> () {
new TaskData() {
TaskId = 2,
TaskName = "Identify Site location",
StartDate = new DateTime(2019, 04, 02),
Duration = "0",
Progress = 30,
},
new TaskData() {
TaskId = 3,
TaskName = "Perform soil test",
StartDate = new DateTime(2019, 04, 02),
Duration = "4",
Progress = 40,
},
new TaskData() {
TaskId = 4,
TaskName = "Soil test approval",
StartDate = new DateTime(2019, 04, 02),
Duration = "0",
Progress = 30
},
})
},
new TaskData() {
TaskId = 5,
TaskName = "Project estimation",
StartDate = new DateTime(2019, 04, 02),
EndDate = new DateTime(2019, 04, 21),
SubTasks = (new List <TaskData> () {
new TaskData() {
TaskId = 6,
TaskName = "Develop floor plan for estimation",
StartDate = new DateTime(2019, 04, 04),
Duration = "3",
Progress = 30,
},
new TaskData() {
TaskId = 7,
TaskName = "List materials",
StartDate = new DateTime(2019, 04, 04),
Duration = "3",
Progress = 40
},
new TaskData() {
TaskId = 8,
TaskName = "Estimation approval",
StartDate = new DateTime(2019, 04, 04),
Duration = "0",
Progress = 30,
}
})
}
};
return Tasks;
}
}
RowDeselected
RowDeselected event triggers when a selected row is deselected.
@using Syncfusion.Blazor.Gantt
@using Syncfusion.Blazor.Grids
<SfGantt DataSource="@TaskCollection" Height="450px" Width="900px" >
<GanttTaskFields Id="TaskId" Name="TaskName" StartDate="StartDate" EndDate="EndDate"
Duration="Duration" Progress="Progress" Child="SubTasks">
</GanttTaskFields>
<GanttSelectionSettings Mode="SelectionMode.Cell"></GanttSelectionSettings>
<GanttEvents TValue="TaskData" RowDeselected="RowDeselectHandler"></GanttEvents>
</SfGantt>
@code{
public SfGantt<TaskData> Gantt;
public void RowDeselectHandler(RowDeselectEventArgs<TaskData> args)
{
// Here you can customize your code
}
public List<TaskData> TaskCollection { get; set; }
protected override void OnInitialized()
{
this.TaskCollection = GetTaskCollection();
}
public class TaskData
{
public int TaskId { get; set; }
public string TaskName { get; set; }
public DateTime StartDate { get; set; }
public DateTime EndDate { get; set; }
public string Duration { get; set; }
public int Progress { get; set; }
public List<TaskData> SubTasks { get; set; }
}
public static List<TaskData> GetTaskCollection()
{
List<TaskData> Tasks = new List<TaskData>() {
new TaskData() {
TaskId = 1,
TaskName = "Project initiation",
StartDate = new DateTime(2019, 04, 02),
EndDate = new DateTime(2019, 04, 21),
SubTasks = (new List <TaskData> () {
new TaskData() {
TaskId = 2,
TaskName = "Identify Site location",
StartDate = new DateTime(2019, 04, 02),
Duration = "0",
Progress = 30,
},
new TaskData() {
TaskId = 3,
TaskName = "Perform soil test",
StartDate = new DateTime(2019, 04, 02),
Duration = "4",
Progress = 40,
},
new TaskData() {
TaskId = 4,
TaskName = "Soil test approval",
StartDate = new DateTime(2019, 04, 02),
Duration = "0",
Progress = 30
},
})
},
new TaskData() {
TaskId = 5,
TaskName = "Project estimation",
StartDate = new DateTime(2019, 04, 02),
EndDate = new DateTime(2019, 04, 21),
SubTasks = (new List <TaskData> () {
new TaskData() {
TaskId = 6,
TaskName = "Develop floor plan for estimation",
StartDate = new DateTime(2019, 04, 04),
Duration = "3",
Progress = 30,
},
new TaskData() {
TaskId = 7,
TaskName = "List materials",
StartDate = new DateTime(2019, 04, 04),
Duration = "3",
Progress = 40
},
new TaskData() {
TaskId = 8,
TaskName = "Estimation approval",
StartDate = new DateTime(2019, 04, 04),
Duration = "0",
Progress = 30,
}
})
}
};
return Tasks;
}
}
CellSelecting
CellSelecting event triggers before a cell selection occurs.
@using Syncfusion.Blazor.Gantt
<SfGantt DataSource="@TaskCollection" Height="450px" Width="700px">
<GanttTaskFields Id="TaskId" Name="TaskName" StartDate="StartDate" EndDate="EndDate" Duration="Duration" Progress="Progress" Child="SubTasks">
</GanttTaskFields>
<GanttSelectionSettings Mode="Syncfusion.Blazor.Grids.SelectionMode.Cell"></GanttSelectionSettings>
<GanttEvents CellSelecting="CellSelecting" TValue="TaskData"></GanttEvents>
</SfGantt>
@code{
public void CellSelecting(Syncfusion.Blazor.Grids.CellSelectingEventArgs<TaskData> args)
{
//Here you can customize your code
}
public List<TaskData> TaskCollection { get; set; }
protected override void OnInitialized()
{
this.TaskCollection = GetTaskCollection();
}
public class TaskData
{
public int TaskId { get; set; }
public string TaskName { get; set; }
public DateTime StartDate { get; set; }
public DateTime EndDate { get; set; }
public string Duration { get; set; }
public int Progress { get; set; }
public List<TaskData> SubTasks { get; set; }
}
public static List <TaskData> GetTaskCollection() {
List <TaskData> Tasks = new List <TaskData> () {
new TaskData() {
TaskId = 1,
TaskName = "Project initiation",
StartDate = new DateTime(2019, 04, 02),
EndDate = new DateTime(2019, 04, 21),
SubTasks = (new List <TaskData> () {
new TaskData() {
TaskId = 2,
TaskName = "Identify Site location",
StartDate = new DateTime(2019, 04, 02),
Duration = "0",
Progress = 30,
},
new TaskData() {
TaskId = 3,
TaskName = "Perform soil test",
StartDate = new DateTime(2019, 04, 02),
Duration = "4",
Progress = 40,
},
new TaskData() {
TaskId = 4,
TaskName = "Soil test approval",
StartDate = new DateTime(2019, 04, 02),
Duration = "0",
Progress = 30
},
})
},
new TaskData() {
TaskId = 5,
TaskName = "Project estimation",
StartDate = new DateTime(2019, 04, 02),
EndDate = new DateTime(2019, 04, 21),
SubTasks = (new List <TaskData> () {
new TaskData() {
TaskId = 6,
TaskName = "Develop floor plan for estimation",
StartDate = new DateTime(2019, 04, 04),
Duration = "3",
Progress = 30,
},
new TaskData() {
TaskId = 7,
TaskName = "List materials",
StartDate = new DateTime(2019, 04, 04),
Duration = "3",
Progress = 40
},
new TaskData() {
TaskId = 8,
TaskName = "Estimation approval",
StartDate = new DateTime(2019, 04, 04),
Duration = "0",
Progress = 30,
}
})
}
};
return Tasks;
}
}
CellSelected
CellSelected event triggers after a cell is selected.
@using Syncfusion.Blazor.Gantt
@using Syncfusion.Blazor.Grids
<SfGantt DataSource="@TaskCollection" Height="450px" Width="900px" EnableContextMenu="true">
<GanttTaskFields Id="TaskId" Name="TaskName" StartDate="StartDate" EndDate="EndDate"
Duration="Duration" Progress="Progress" Child="SubTasks">
</GanttTaskFields>
<GanttSelectionSettings Mode="SelectionMode.Cell"></GanttSelectionSettings>
<GanttEvents TValue="TaskData" CellSelected="CellSelectedHandler"></GanttEvents>
</SfGantt>
@code{
public SfGantt<TaskData> Gantt;
public void CellSelectedHandler(CellSelectEventArgs<TaskData> args)
{
// Here you can customize your code
}
public List<TaskData> TaskCollection { get; set; }
protected override void OnInitialized()
{
this.TaskCollection = GetTaskCollection();
}
public class TaskData
{
public int TaskId { get; set; }
public string TaskName { get; set; }
public DateTime StartDate { get; set; }
public DateTime EndDate { get; set; }
public string Duration { get; set; }
public int Progress { get; set; }
public List<TaskData> SubTasks { get; set; }
}
public static List<TaskData> GetTaskCollection()
{
List<TaskData> Tasks = new List<TaskData>() {
new TaskData() {
TaskId = 1,
TaskName = "Project initiation",
StartDate = new DateTime(2019, 04, 02),
EndDate = new DateTime(2019, 04, 21),
SubTasks = (new List <TaskData> () {
new TaskData() {
TaskId = 2,
TaskName = "Identify Site location",
StartDate = new DateTime(2019, 04, 02),
Duration = "0",
Progress = 30,
},
new TaskData() {
TaskId = 3,
TaskName = "Perform soil test",
StartDate = new DateTime(2019, 04, 02),
Duration = "4",
Progress = 40,
},
new TaskData() {
TaskId = 4,
TaskName = "Soil test approval",
StartDate = new DateTime(2019, 04, 02),
Duration = "0",
Progress = 30
},
})
},
new TaskData() {
TaskId = 5,
TaskName = "Project estimation",
StartDate = new DateTime(2019, 04, 02),
EndDate = new DateTime(2019, 04, 21),
SubTasks = (new List <TaskData> () {
new TaskData() {
TaskId = 6,
TaskName = "Develop floor plan for estimation",
StartDate = new DateTime(2019, 04, 04),
Duration = "3",
Progress = 30,
},
new TaskData() {
TaskId = 7,
TaskName = "List materials",
StartDate = new DateTime(2019, 04, 04),
Duration = "3",
Progress = 40
},
new TaskData() {
TaskId = 8,
TaskName = "Estimation approval",
StartDate = new DateTime(2019, 04, 04),
Duration = "0",
Progress = 30,
}
})
}
};
return Tasks;
}
}
CellDeselecting
CellDeselecting event triggers before a cell is deselected.
@using Syncfusion.Blazor.Gantt
@using Syncfusion.Blazor.Grids
<SfGantt DataSource="@TaskCollection" Height="450px" Width="900px" EnableContextMenu="true">
<GanttTaskFields Id="TaskId" Name="TaskName" StartDate="StartDate" EndDate="EndDate"
Duration="Duration" Progress="Progress" Child="SubTasks">
</GanttTaskFields>
<GanttSelectionSettings Mode="SelectionMode.Cell"></GanttSelectionSettings>
<GanttEvents TValue="TaskData" CellDeselecting="CellDeselectingHandler"></GanttEvents>
</SfGantt>
@code{
public SfGantt<TaskData> Gantt;
public void CellDeselectingHandler(CellDeselectEventArgs<TaskData> args)
{
// Here you can customize your code
}
public List<TaskData> TaskCollection { get; set; }
protected override void OnInitialized()
{
this.TaskCollection = GetTaskCollection();
}
public class TaskData
{
public int TaskId { get; set; }
public string TaskName { get; set; }
public DateTime StartDate { get; set; }
public DateTime EndDate { get; set; }
public string Duration { get; set; }
public int Progress { get; set; }
public List<TaskData> SubTasks { get; set; }
}
public static List<TaskData> GetTaskCollection()
{
List<TaskData> Tasks = new List<TaskData>() {
new TaskData() {
TaskId = 1,
TaskName = "Project initiation",
StartDate = new DateTime(2019, 04, 02),
EndDate = new DateTime(2019, 04, 21),
SubTasks = (new List <TaskData> () {
new TaskData() {
TaskId = 2,
TaskName = "Identify Site location",
StartDate = new DateTime(2019, 04, 02),
Duration = "0",
Progress = 30,
},
new TaskData() {
TaskId = 3,
TaskName = "Perform soil test",
StartDate = new DateTime(2019, 04, 02),
Duration = "4",
Progress = 40,
},
new TaskData() {
TaskId = 4,
TaskName = "Soil test approval",
StartDate = new DateTime(2019, 04, 02),
Duration = "0",
Progress = 30
},
})
},
new TaskData() {
TaskId = 5,
TaskName = "Project estimation",
StartDate = new DateTime(2019, 04, 02),
EndDate = new DateTime(2019, 04, 21),
SubTasks = (new List <TaskData> () {
new TaskData() {
TaskId = 6,
TaskName = "Develop floor plan for estimation",
StartDate = new DateTime(2019, 04, 04),
Duration = "3",
Progress = 30,
},
new TaskData() {
TaskId = 7,
TaskName = "List materials",
StartDate = new DateTime(2019, 04, 04),
Duration = "3",
Progress = 40
},
new TaskData() {
TaskId = 8,
TaskName = "Estimation approval",
StartDate = new DateTime(2019, 04, 04),
Duration = "0",
Progress = 30,
}
})
}
};
return Tasks;
}
}
CellDeselected
CellDeselected event triggers after a cell is deselected.
@using Syncfusion.Blazor.Gantt
@using Syncfusion.Blazor.Grids
<SfGantt DataSource="@TaskCollection" Height="450px" Width="900px" EnableContextMenu="true">
<GanttTaskFields Id="TaskId" Name="TaskName" StartDate="StartDate" EndDate="EndDate"
Duration="Duration" Progress="Progress" Child="SubTasks">
</GanttTaskFields>
<GanttSelectionSettings Mode="SelectionMode.Cell"></GanttSelectionSettings>
<GanttEvents TValue="TaskData" CellDeselected="CellDeselectedHandler"></GanttEvents>
</SfGantt>
@code{
public SfGantt<TaskData> Gantt;
public void CellDeselectedHandler(CellDeselectEventArgs<TaskData> args)
{
// Here you can customize your code
}
public List<TaskData> TaskCollection { get; set; }
protected override void OnInitialized()
{
this.TaskCollection = GetTaskCollection();
}
public class TaskData
{
public int TaskId { get; set; }
public string TaskName { get; set; }
public DateTime StartDate { get; set; }
public DateTime EndDate { get; set; }
public string Duration { get; set; }
public int Progress { get; set; }
public List<TaskData> SubTasks { get; set; }
}
public static List<TaskData> GetTaskCollection()
{
List<TaskData> Tasks = new List<TaskData>() {
new TaskData() {
TaskId = 1,
TaskName = "Project initiation",
StartDate = new DateTime(2019, 04, 02),
EndDate = new DateTime(2019, 04, 21),
SubTasks = (new List <TaskData> () {
new TaskData() {
TaskId = 2,
TaskName = "Identify Site location",
StartDate = new DateTime(2019, 04, 02),
Duration = "0",
Progress = 30,
},
new TaskData() {
TaskId = 3,
TaskName = "Perform soil test",
StartDate = new DateTime(2019, 04, 02),
Duration = "4",
Progress = 40,
},
new TaskData() {
TaskId = 4,
TaskName = "Soil test approval",
StartDate = new DateTime(2019, 04, 02),
Duration = "0",
Progress = 30
},
})
},
new TaskData() {
TaskId = 5,
TaskName = "Project estimation",
StartDate = new DateTime(2019, 04, 02),
EndDate = new DateTime(2019, 04, 21),
SubTasks = (new List <TaskData> () {
new TaskData() {
TaskId = 6,
TaskName = "Develop floor plan for estimation",
StartDate = new DateTime(2019, 04, 04),
Duration = "3",
Progress = 30,
},
new TaskData() {
TaskId = 7,
TaskName = "List materials",
StartDate = new DateTime(2019, 04, 04),
Duration = "3",
Progress = 40
},
new TaskData() {
TaskId = 8,
TaskName = "Estimation approval",
StartDate = new DateTime(2019, 04, 04),
Duration = "0",
Progress = 30,
}
})
}
};
return Tasks;
}
}
OnToolbarClick
OnToolbarClick event triggers when toolbar item is clicked.
@using Syncfusion.Blazor.Gantt
@using Syncfusion.Blazor.Navigations
<SfGantt DataSource="@TaskCollection" Toolbar="Toolbaritems" Height="450px" Width="900px">
<GanttTaskFields Id="TaskId" Name="TaskName" StartDate="StartDate" EndDate="EndDate"
Duration="Duration" Progress="Progress" Child="SubTasks">
</GanttTaskFields>
<GanttEvents OnToolbarClick="ToolbarClickHandler" TValue="TaskData"></GanttEvents>
</SfGantt>
@code{
public SfGantt<TaskData> Gantt;
public List<Object> Toolbaritems = new List<Object>() { "ExpandAll", "CollapseAll", new ItemModel() { Text = "Test", TooltipText = "Test", Id = "Test" } };
public void ToolbarClickHandler(ClickEventArgs args)
{
//Here you can customize your code
}
public List<TaskData> TaskCollection { get; set; }
protected override void OnInitialized()
{
this.TaskCollection = GetTaskCollection();
}
public class TaskData
{
public int TaskId { get; set; }
public string TaskName { get; set; }
public DateTime StartDate { get; set; }
public DateTime EndDate { get; set; }
public string Duration { get; set; }
public int Progress { get; set; }
public List<TaskData> SubTasks { get; set; }
}
public static List<TaskData> GetTaskCollection()
{
List<TaskData> Tasks = new List<TaskData>() {
new TaskData() {
TaskId = 1,
TaskName = "Project initiation",
StartDate = new DateTime(2019, 04, 02),
EndDate = new DateTime(2019, 04, 21),
SubTasks = (new List <TaskData> () {
new TaskData() {
TaskId = 2,
TaskName = "Identify Site location",
StartDate = new DateTime(2019, 04, 02),
Duration = "0",
Progress = 30,
},
new TaskData() {
TaskId = 3,
TaskName = "Perform soil test",
StartDate = new DateTime(2019, 04, 02),
Duration = "4",
Progress = 40,
},
new TaskData() {
TaskId = 4,
TaskName = "Soil test approval",
StartDate = new DateTime(2019, 04, 02),
Duration = "0",
Progress = 30
},
})
},
new TaskData() {
TaskId = 5,
TaskName = "Project estimation",
StartDate = new DateTime(2019, 04, 02),
EndDate = new DateTime(2019, 04, 21),
SubTasks = (new List <TaskData> () {
new TaskData() {
TaskId = 6,
TaskName = "Develop floor plan for estimation",
StartDate = new DateTime(2019, 04, 04),
Duration = "3",
Progress = 30,
},
new TaskData() {
TaskId = 7,
TaskName = "List materials",
StartDate = new DateTime(2019, 04, 04),
Duration = "3",
Progress = 40
},
new TaskData() {
TaskId = 8,
TaskName = "Estimation approval",
StartDate = new DateTime(2019, 04, 04),
Duration = "0",
Progress = 30,
}
})
}
};
return Tasks;
}
}
ColumnMenuClicked
ColumnMenuClicked event triggers while clicking on the column menu.
@using Syncfusion.Blazor.Gantt
@using Syncfusion.Blazor.Grids
<SfGantt DataSource="@TaskCollection" Height="450px" Width="900px" EnableContextMenu="true">
<GanttTaskFields Id="TaskId" Name="TaskName" StartDate="StartDate" EndDate="EndDate"
Duration="Duration" Progress="Progress" Child="SubTasks">
</GanttTaskFields>
<GanttEvents TValue="TaskData" ColumnMenuClicked="ColumnMenuClickedHandler" ></GanttEvents>
</SfGantt>
@code{
public SfGantt<TaskData> Gantt;
public void ColumnMenuClickedHandler(ColumnMenuClickEventArgs args)
{
// Here you can customize your code
}
public List<TaskData> TaskCollection { get; set; }
protected override void OnInitialized()
{
this.TaskCollection = GetTaskCollection();
}
public class TaskData
{
public int TaskId { get; set; }
public string TaskName { get; set; }
public DateTime StartDate { get; set; }
public DateTime EndDate { get; set; }
public string Duration { get; set; }
public int Progress { get; set; }
public List<TaskData> SubTasks { get; set; }
}
public static List<TaskData> GetTaskCollection()
{
List<TaskData> Tasks = new List<TaskData>() {
new TaskData() {
TaskId = 1,
TaskName = "Project initiation",
StartDate = new DateTime(2019, 04, 02),
EndDate = new DateTime(2019, 04, 21),
SubTasks = (new List <TaskData> () {
new TaskData() {
TaskId = 2,
TaskName = "Identify Site location",
StartDate = new DateTime(2019, 04, 02),
Duration = "0",
Progress = 30,
},
new TaskData() {
TaskId = 3,
TaskName = "Perform soil test",
StartDate = new DateTime(2019, 04, 02),
Duration = "4",
Progress = 40,
},
new TaskData() {
TaskId = 4,
TaskName = "Soil test approval",
StartDate = new DateTime(2019, 04, 02),
Duration = "0",
Progress = 30
},
})
},
new TaskData() {
TaskId = 5,
TaskName = "Project estimation",
StartDate = new DateTime(2019, 04, 02),
EndDate = new DateTime(2019, 04, 21),
SubTasks = (new List <TaskData> () {
new TaskData() {
TaskId = 6,
TaskName = "Develop floor plan for estimation",
StartDate = new DateTime(2019, 04, 04),
Duration = "3",
Progress = 30,
},
new TaskData() {
TaskId = 7,
TaskName = "List materials",
StartDate = new DateTime(2019, 04, 04),
Duration = "3",
Progress = 40
},
new TaskData() {
TaskId = 8,
TaskName = "Estimation approval",
StartDate = new DateTime(2019, 04, 04),
Duration = "0",
Progress = 30,
}
})
}
};
return Tasks;
}
}
ContextMenuItemClicked
ContextMenuItemClicked event triggers while clicking on the context menu.
@using Syncfusion.Blazor.Gantt
@using Syncfusion.Blazor.Grids
<SfGantt DataSource="@TaskCollection" Height="450px" Width="900px" EnableContextMenu="true">
<GanttTaskFields Id="TaskId" Name="TaskName" StartDate="StartDate" EndDate="EndDate"
Duration="Duration" Progress="Progress" Child="SubTasks">
</GanttTaskFields>
<GanttEvents TValue="TaskData" ContextMenuItemClicked="ContextMenuItemClickedHandler" ></GanttEvents>
</SfGantt>
@code{
public SfGantt<TaskData> Gantt;
public void ContextMenuItemClickedHandler(ContextMenuClickEventArgs<TaskData> args)
{
// Here you can customize your code
}
public List<TaskData> TaskCollection { get; set; }
protected override void OnInitialized()
{
this.TaskCollection = GetTaskCollection();
}
public class TaskData
{
public int TaskId { get; set; }
public string TaskName { get; set; }
public DateTime StartDate { get; set; }
public DateTime EndDate { get; set; }
public string Duration { get; set; }
public int Progress { get; set; }
public List<TaskData> SubTasks { get; set; }
}
public static List<TaskData> GetTaskCollection()
{
List<TaskData> Tasks = new List<TaskData>() {
new TaskData() {
TaskId = 1,
TaskName = "Project initiation",
StartDate = new DateTime(2019, 04, 02),
EndDate = new DateTime(2019, 04, 21),
SubTasks = (new List <TaskData> () {
new TaskData() {
TaskId = 2,
TaskName = "Identify Site location",
StartDate = new DateTime(2019, 04, 02),
Duration = "0",
Progress = 30,
},
new TaskData() {
TaskId = 3,
TaskName = "Perform soil test",
StartDate = new DateTime(2019, 04, 02),
Duration = "4",
Progress = 40,
},
new TaskData() {
TaskId = 4,
TaskName = "Soil test approval",
StartDate = new DateTime(2019, 04, 02),
Duration = "0",
Progress = 30
},
})
},
new TaskData() {
TaskId = 5,
TaskName = "Project estimation",
StartDate = new DateTime(2019, 04, 02),
EndDate = new DateTime(2019, 04, 21),
SubTasks = (new List <TaskData> () {
new TaskData() {
TaskId = 6,
TaskName = "Develop floor plan for estimation",
StartDate = new DateTime(2019, 04, 04),
Duration = "3",
Progress = 30,
},
new TaskData() {
TaskId = 7,
TaskName = "List materials",
StartDate = new DateTime(2019, 04, 04),
Duration = "3",
Progress = 40
},
new TaskData() {
TaskId = 8,
TaskName = "Estimation approval",
StartDate = new DateTime(2019, 04, 04),
Duration = "0",
Progress = 30,
}
})
}
};
return Tasks;
}
}
ContextMenuOpen
ContextMenuOpen event triggers before opening the context menu.
@using Syncfusion.Blazor.Gantt
@using Syncfusion.Blazor.Grids
<SfGantt DataSource="@TaskCollection" Height="450px" Width="900px" EnableContextMenu="true">
<GanttTaskFields Id="TaskId" Name="TaskName" StartDate="StartDate" EndDate="EndDate"
Duration="Duration" Progress="Progress" Child="SubTasks">
</GanttTaskFields>
<GanttEvents TValue="TaskData" ContextMenuOpen="ContextMenuOpenHandler" ></GanttEvents>
</SfGantt>
@code{
public SfGantt<TaskData> Gantt;
public void ContextMenuOpenHandler(ContextMenuOpenEventArgs<TaskData> args)
{
// Here you can customize your code
}
public List<TaskData> TaskCollection { get; set; }
protected override void OnInitialized()
{
this.TaskCollection = GetTaskCollection();
}
public class TaskData
{
public int TaskId { get; set; }
public string TaskName { get; set; }
public DateTime StartDate { get; set; }
public DateTime EndDate { get; set; }
public string Duration { get; set; }
public int Progress { get; set; }
public List<TaskData> SubTasks { get; set; }
}
public static List<TaskData> GetTaskCollection()
{
List<TaskData> Tasks = new List<TaskData>() {
new TaskData() {
TaskId = 1,
TaskName = "Project initiation",
StartDate = new DateTime(2019, 04, 02),
EndDate = new DateTime(2019, 04, 21),
SubTasks = (new List <TaskData> () {
new TaskData() {
TaskId = 2,
TaskName = "Identify Site location",
StartDate = new DateTime(2019, 04, 02),
Duration = "0",
Progress = 30,
},
new TaskData() {
TaskId = 3,
TaskName = "Perform soil test",
StartDate = new DateTime(2019, 04, 02),
Duration = "4",
Progress = 40,
},
new TaskData() {
TaskId = 4,
TaskName = "Soil test approval",
StartDate = new DateTime(2019, 04, 02),
Duration = "0",
Progress = 30
},
})
},
new TaskData() {
TaskId = 5,
TaskName = "Project estimation",
StartDate = new DateTime(2019, 04, 02),
EndDate = new DateTime(2019, 04, 21),
SubTasks = (new List <TaskData> () {
new TaskData() {
TaskId = 6,
TaskName = "Develop floor plan for estimation",
StartDate = new DateTime(2019, 04, 04),
Duration = "3",
Progress = 30,
},
new TaskData() {
TaskId = 7,
TaskName = "List materials",
StartDate = new DateTime(2019, 04, 04),
Duration = "3",
Progress = 40
},
new TaskData() {
TaskId = 8,
TaskName = "Estimation approval",
StartDate = new DateTime(2019, 04, 04),
Duration = "0",
Progress = 30,
}
})
}
};
return Tasks;
}
}
Collapsed
Collapsed event triggers after row get collapsed.
@using Syncfusion.Blazor.Gantt
@using Syncfusion.Blazor.TreeGrid
<SfGantt DataSource="@TaskCollection" Height="450px" Width="900px" AllowRowDragAndDrop="true">
<GanttTaskFields Id="TaskId" Name="TaskName" StartDate="StartDate" EndDate="EndDate"
Duration="Duration" Progress="Progress" Child="SubTasks">
</GanttTaskFields>
<GanttEditSettings AllowTaskbarEditing="true"></GanttEditSettings>
<GanttEvents Collapsed="Collapsed" TValue="TaskData"></GanttEvents>
</SfGantt>
@code{
public SfGantt<TaskData> Gantt;
public void Collapsed(RowCollapsedEventArgs<TaskData> args)
{
// Here you can customize your code
}
public List<TaskData> TaskCollection { get; set; }
protected override void OnInitialized()
{
this.TaskCollection = GetTaskCollection();
}
public class TaskData
{
public int TaskId { get; set; }
public string TaskName { get; set; }
public DateTime StartDate { get; set; }
public DateTime EndDate { get; set; }
public string Duration { get; set; }
public int Progress { get; set; }
public List<TaskData> SubTasks { get; set; }
}
public static List<TaskData> GetTaskCollection()
{
List<TaskData> Tasks = new List<TaskData>() {
new TaskData() {
TaskId = 1,
TaskName = "Project initiation",
StartDate = new DateTime(2019, 04, 02),
EndDate = new DateTime(2019, 04, 21),
SubTasks = (new List <TaskData> () {
new TaskData() {
TaskId = 2,
TaskName = "Identify Site location",
StartDate = new DateTime(2019, 04, 02),
Duration = "0",
Progress = 30,
},
new TaskData() {
TaskId = 3,
TaskName = "Perform soil test",
StartDate = new DateTime(2019, 04, 02),
Duration = "4",
Progress = 40,
},
new TaskData() {
TaskId = 4,
TaskName = "Soil test approval",
StartDate = new DateTime(2019, 04, 02),
Duration = "0",
Progress = 30
},
})
},
new TaskData() {
TaskId = 5,
TaskName = "Project estimation",
StartDate = new DateTime(2019, 04, 02),
EndDate = new DateTime(2019, 04, 21),
SubTasks = (new List <TaskData> () {
new TaskData() {
TaskId = 6,
TaskName = "Develop floor plan for estimation",
StartDate = new DateTime(2019, 04, 04),
Duration = "3",
Progress = 30,
},
new TaskData() {
TaskId = 7,
TaskName = "List materials",
StartDate = new DateTime(2019, 04, 04),
Duration = "3",
Progress = 40
},
new TaskData() {
TaskId = 8,
TaskName = "Estimation approval",
StartDate = new DateTime(2019, 04, 04),
Duration = "0",
Progress = 30,
}
})
}
};
return Tasks;
}
}
Collapsing
Collapsing event triggers before row get collapsed.
@using Syncfusion.Blazor.Gantt
@using Syncfusion.Blazor.TreeGrid
<SfGantt DataSource="@TaskCollection" Height="450px" Width="900px" AllowRowDragAndDrop="true">
<GanttTaskFields Id="TaskId" Name="TaskName" StartDate="StartDate" EndDate="EndDate"
Duration="Duration" Progress="Progress" Child="SubTasks">
</GanttTaskFields>
<GanttEditSettings AllowTaskbarEditing="true"></GanttEditSettings>
<GanttEvents Collapsing="Collapsed" TValue="TaskData"></GanttEvents>
</SfGantt>
@code{
public SfGantt<TaskData> Gantt;
public void Collapsed(RowCollapsingEventArgs<TaskData> args)
{
// Here you can customize your code
}
public List<TaskData> TaskCollection { get; set; }
protected override void OnInitialized()
{
this.TaskCollection = GetTaskCollection();
}
public class TaskData
{
public int TaskId { get; set; }
public string TaskName { get; set; }
public DateTime StartDate { get; set; }
public DateTime EndDate { get; set; }
public string Duration { get; set; }
public int Progress { get; set; }
public List<TaskData> SubTasks { get; set; }
}
public static List<TaskData> GetTaskCollection()
{
List<TaskData> Tasks = new List<TaskData>() {
new TaskData() {
TaskId = 1,
TaskName = "Project initiation",
StartDate = new DateTime(2019, 04, 02),
EndDate = new DateTime(2019, 04, 21),
SubTasks = (new List <TaskData> () {
new TaskData() {
TaskId = 2,
TaskName = "Identify Site location",
StartDate = new DateTime(2019, 04, 02),
Duration = "0",
Progress = 30,
},
new TaskData() {
TaskId = 3,
TaskName = "Perform soil test",
StartDate = new DateTime(2019, 04, 02),
Duration = "4",
Progress = 40,
},
new TaskData() {
TaskId = 4,
TaskName = "Soil test approval",
StartDate = new DateTime(2019, 04, 02),
Duration = "0",
Progress = 30
},
})
},
new TaskData() {
TaskId = 5,
TaskName = "Project estimation",
StartDate = new DateTime(2019, 04, 02),
EndDate = new DateTime(2019, 04, 21),
SubTasks = (new List <TaskData> () {
new TaskData() {
TaskId = 6,
TaskName = "Develop floor plan for estimation",
StartDate = new DateTime(2019, 04, 04),
Duration = "3",
Progress = 30,
},
new TaskData() {
TaskId = 7,
TaskName = "List materials",
StartDate = new DateTime(2019, 04, 04),
Duration = "3",
Progress = 40
},
new TaskData() {
TaskId = 8,
TaskName = "Estimation approval",
StartDate = new DateTime(2019, 04, 04),
Duration = "0",
Progress = 30,
}
})
}
};
return Tasks;
}
}
Expanding
Expanding event triggers when a row is expanding.
using Syncfusion.Blazor.Gantt
<SfGantt DataSource="@TaskCollection" Height="450px" Width="900px">
<GanttTaskFields Id="TaskId" Name="TaskName" StartDate="StartDate" EndDate="EndDate"
Duration="Duration" Progress="Progress" Child="SubTasks">
</GanttTaskFields>
<GanttEvents Expanding="Expanding" TValue="TaskData"></GanttEvents>
</SfGantt>
@code{
public void Expanding(Syncfusion.Blazor.TreeGrid.RowExpandingEventArgs<TaskData> args)
{
// Here you can customize your code
}
public List<TaskData> TaskCollection { get; set; }
protected override void OnInitialized()
{
this.TaskCollection = GetTaskCollection();
}
public class TaskData
{
public int TaskId { get; set; }
public string TaskName { get; set; }
public DateTime StartDate { get; set; }
public DateTime EndDate { get; set; }
public string Duration { get; set; }
public int Progress { get; set; }
public List<TaskData> SubTasks { get; set; }
}
public static List<TaskData> GetTaskCollection()
{
List<TaskData> Tasks = new List<TaskData>() {
new TaskData() {
TaskId = 1,
TaskName = "Project initiation",
StartDate = new DateTime(2019, 04, 02),
EndDate = new DateTime(2019, 04, 21),
SubTasks = (new List <TaskData> () {
new TaskData() {
TaskId = 2,
TaskName = "Identify Site location",
StartDate = new DateTime(2019, 04, 02),
Duration = "0",
Progress = 30,
},
new TaskData() {
TaskId = 3,
TaskName = "Perform soil test",
StartDate = new DateTime(2019, 04, 02),
Duration = "4",
Progress = 40,
},
new TaskData() {
TaskId = 4,
TaskName = "Soil test approval",
StartDate = new DateTime(2019, 04, 02),
Duration = "0",
Progress = 30
},
})
},
new TaskData() {
TaskId = 5,
TaskName = "Project estimation",
StartDate = new DateTime(2019, 04, 02),
EndDate = new DateTime(2019, 04, 21),
SubTasks = (new List <TaskData> () {
new TaskData() {
TaskId = 6,
TaskName = "Develop floor plan for estimation",
StartDate = new DateTime(2019, 04, 04),
Duration = "3",
Progress = 30,
},
new TaskData() {
TaskId = 7,
TaskName = "List materials",
StartDate = new DateTime(2019, 04, 04),
Duration = "3",
Progress = 40
},
new TaskData() {
TaskId = 8,
TaskName = "Estimation approval",
StartDate = new DateTime(2019, 04, 04),
Duration = "0",
Progress = 30,
}
})
}
};
return Tasks;
}
}
Expanded
Expanded event triggers when a row is expanded.
@using Syncfusion.Blazor.Gantt
@using Syncfusion.Blazor.TreeGrid
<SfGantt DataSource="@TaskCollection" Height="450px" Width="900px">
<GanttTaskFields Id="TaskId" Name="TaskName" StartDate="StartDate" EndDate="EndDate"
Duration="Duration" Progress="Progress" Child="SubTasks">
</GanttTaskFields>
<GanttEvents TValue="TaskData" Expanded="ExpandedHandler" ></GanttEvents>
</SfGantt>
@code{
public SfGantt<TaskData> Gantt;
public void ExpandedHandler(RowExpandedEventArgs<TaskData> args)
{
// Here you can customize your code
}
public List<TaskData> TaskCollection { get; set; }
protected override void OnInitialized()
{
this.TaskCollection = GetTaskCollection();
}
public class TaskData
{
public int TaskId { get; set; }
public string TaskName { get; set; }
public DateTime StartDate { get; set; }
public DateTime EndDate { get; set; }
public string Duration { get; set; }
public int Progress { get; set; }
public List<TaskData> SubTasks { get; set; }
}
public static List<TaskData> GetTaskCollection()
{
List<TaskData> Tasks = new List<TaskData>() {
new TaskData() {
TaskId = 1,
TaskName = "Project initiation",
StartDate = new DateTime(2019, 04, 02),
EndDate = new DateTime(2019, 04, 21),
SubTasks = (new List <TaskData> () {
new TaskData() {
TaskId = 2,
TaskName = "Identify Site location",
StartDate = new DateTime(2019, 04, 02),
Duration = "0",
Progress = 30,
},
new TaskData() {
TaskId = 3,
TaskName = "Perform soil test",
StartDate = new DateTime(2019, 04, 02),
Duration = "4",
Progress = 40,
},
new TaskData() {
TaskId = 4,
TaskName = "Soil test approval",
StartDate = new DateTime(2019, 04, 02),
Duration = "0",
Progress = 30
},
})
},
new TaskData() {
TaskId = 5,
TaskName = "Project estimation",
StartDate = new DateTime(2019, 04, 02),
EndDate = new DateTime(2019, 04, 21),
SubTasks = (new List <TaskData> () {
new TaskData() {
TaskId = 6,
TaskName = "Develop floor plan for estimation",
StartDate = new DateTime(2019, 04, 04),
Duration = "3",
Progress = 30,
},
new TaskData() {
TaskId = 7,
TaskName = "List materials",
StartDate = new DateTime(2019, 04, 04),
Duration = "3",
Progress = 40
},
new TaskData() {
TaskId = 8,
TaskName = "Estimation approval",
StartDate = new DateTime(2019, 04, 04),
Duration = "0",
Progress = 30,
}
})
}
};
return Tasks;
}
}
We are not going to limit Gantt Chart with these events, we will be adding new events in the future based on the user requests. If the event, you are looking for is not on the list, then please request here.